Page 135 — Vesting Rights and Periods

Original section ↗ · Link to this section

“Construction” means the erection of construction materials in a permanent manner, and includes excavation, demolition, or removal of an existing building.

“Development plan” means both a preliminary development plan and a final development plan.

“Development standards” means all locally adopted or enforced standards applicable to the development of property including, but not limited to planning: storm water requirements; layout; design; local infrastructure construction standards, off-site improvements, lot size, configuration, and dimensions. NOT included are standards required by federal or state law, or building construction safety codes.

“Final development plan” means a plan approved by the local government describing with reasonable certainty the use of property. Such plan may be in the form of, but not limited to, a planned unit development plan; subdivision plat; general development plan; subdivision infrastructure construction plan; final engineered site plan; or any other land-use approval designated utilized. UNLESS otherwise expressly provided by the City of Athens, such a plan shall include the boundaries of the site; significant topographical features affecting the development of the site; locations of improvements; building dimensions; and the location of all existing and proposed infrastructure on the site. Neither a sketch plan nor other document that fails to describe with reasonable certainty the use and development scheme may constitute a final development plan.

“Preliminary development plan” means a plan submitted to facilitate initial public feedback, and secure preliminary approvals from local government. It serves as a guide for all future improvements.

“Site preparation” means excavation, grading, demolition, drainage, and physical improvements such as water and sewer lines, footings, and foundations.

Vesting Rights and Periods

Vested property rights are established for any preliminary development plan, final development plan (where no preliminary development plan is required), or building permit issued to allow construction of a building to commence where there is no local requirement for prior approval of a preliminary development plan.

During the vesting period, the locally adopted development standards in effect on the date of approval remain the development standards applicable to that property or building during the vesting period as follows:

• Building permit projects (no preliminary plan approval) - The vesting period commences on the date of building permit issuance and remains in effect for the period authorized by the building permit.

• Development plan project - The vesting period applicable to a development plan is three years, beginning on the date of approval of the preliminary development plan; provided the applicant obtains final development

135