ContentsCHAPTER 16-VII EXCAVATIONS

CHAPTER 16-VII EXCAVATIONS

Original section ↗ · Link to this section












16-188 Permit Required

Original section ↗ · Link to this section

16-189 Applications

Original section ↗ · Link to this section

Applications for excavation permits shall be made to the recorder, or such person as he may designate to receive such applications, and shall state thereon the location of the intended excavation or tunnel, the size thereof, the purpose thereof, the person or entity doing the actual excavating, and the name of the person or entity for whom the work is being done, and shall contain an agreement that the applicant will comply with all ordinances and laws relating to the work to be done. Such application shall be rejected or approved by the recorder within 24 hours of its filing.

16-190 Fee

Original section ↗ · Link to this section

The fee for excavation permits shall be $20.00.

16-191 Deposit Or Bond

Original section ↗ · Link to this section

16-192 Safety Restrictions On Excavations

Original section ↗ · Link to this section

Any person or entity making any excavation or tunnel shall do so according to the terms and conditions of the application and permit authorizing the work to be done. Sufficient and proper barricades and lights shall be maintained to protect persons and property from injury by or because of the excavation being made. If any sidewalk is blocked by any such work, a temporary sidewalk shall be constructed and provided which shall be safe for travel and convenient for users.

16-193 Restoration Of Streets, Etc.

Original section ↗ · Link to this section

16-194 Insurance

Original section ↗ · Link to this section

16-195 Time Limits

Original section ↗ · Link to this section

Each application for a permit shall state the length of time it is estimated will elapse from the commencement of the work until the restoration of the surface of the ground or pavement, or until the refill is made ready for the pavement to be put on by the city if the city restores such surface pavement. It is unlawful to fail to comply with this time limitation unless permission for an extension of time is granted by the recorder.

16-196 Supervision

Original section ↗ · Link to this section

The person designated by the city council shall from time to time inspect all excavations and tunnels being made in or under any public street, alley, or other public place in the city and see to the enforcement of the provisions of this chapter. Notice shall be given to him at least ten hours before the work of refilling any such excavation or tunnel commences.

16-197 Violations And Penalty

Original section ↗ · Link to this section

Any violation of this chapter shall constitute a civil offense and shall be punishable by a civil penalty under ACC 1-13, by revocation of permit, or by both civil penalty and revocation. Each day a violation shall be allowed to continue shall constitute a separate offense.