14-63 Control Measures
Original section ↗ · Link to this section
The following control measures shall be used as a minimum for erosion control:
- (1) The smallest practical area of land should be exposed at any one time during development. Mulching or other protective measures shall be used to protect exposed areas.
- (2) Areas that will be exposed for more than three months shall be seeded and mulched or landscaped.
- (3) Temporary furrows, terraces, sediment or debris basins shall be installed to prevent washing and erosion during construction.
- (4) In areas where soil may wash onto the roadway or into a drainage basin, the developer will be required to install and maintain a silt fence, hay bales, or both.
- (5) Final vegetation shall be installed as soon as practical in the development after the land is exposed.
- (6) A gravel construction entrance shall be constructed prior to any site work. The owner or his/her contractor throughout the construction process will maintain this construction entrance.
- (7) Sediment washed onto roadways or into drainage ditches or basins, and soil tracked onto roadways by construction equipment/vehicles or daily ingress and egress onto the site, shall be removed at the end of each working day by the contractor, developer, or property owner.