2025 3 18 Packet 2
City Council · packet · 143 pages · Descriptive metadata inferred from filename
Extracted text for page 79
Unverified text extraction. Check the original page for numbers, names, and layout.
ORDINANCE NO. 1138 Page 8 of 19 (iii.) TDEC Erosion and Sediment Control Handbook as amended (b) The City of Athens has adopted the following design storm events for EPSC measures to be used for Construction Stormwater Control Measures. Depth/Intensity values shall align with NOAA Atlas data for Athens (Station 40- 0284). The EPSC and sediment BMP construction design storm events are as follows: (i.) A 2-year 24-hour design storm shall be used for sizing project EPSC and BMPs discharging into waters not identified as having unavailable parameters or Exceptional Tennessee Waters (ii.) A 5-year 24-hour design storm shall be used for sizing project EPSC and BMPs discharging into waters with unavailable parameters due to siltation or Exceptional Tennessee Waters (c) Construction requirements for design storm for all waters as well as special conditions for unavailable parameters waters or exceptional Tennessee waters shall be consistent with those of the current Tennessee Construction General Permit (TNR100000) as amended. (2) The City has adopted, for use in design of construction EPSC measures, the design storm requirements from the current Tennessee Construction General Permit for all waters as well as special conditions for unavailable parameters or Exceptional Tennessee Waters. (3) Waste Control Construction site operators are required to minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater. (4) Priority Construction (a) Priority in construction shall be, at a minimum, construction activities discharging directly into, or immediately upstream of, waters the state recognizes as having an unavailable condition for siltation or Exceptional Tennessee Waters. (b) All priority construction activities must include preconstruction meetings with construction site operators for priority construction activities. (c) The status of any waters within the City’s jurisdiction shall be determined by referencing TDEC’s “EPA Approved List of Impaired and Threatened Waters” required by Section 303(d) of the Clean Water Act, as amended. (5) Land development permit (a) This section shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, land disturbance applications and grading applications. These standards apply to qualifying new development or redevelopment site(s). A developer will be required to obtain a land disturbance permit from the City in the following cases: (i.) New development that involves land development or disturbance activities of one (1) acre or more; or, (b) Projects of less than one acre of total land disturbance may also be required to obtain authorization under this ordinance if: (i.) The City has determined that the stormwater discharge from a site is causing, contributing to, or is likely to contribute to a violation of a state water quality standard; or is likely to be a significant contributor of pollutants to water of the state; or, 73