2025 3 18 Packet 2
City Council · packet · 143 pages · Descriptive metadata inferred from filename
Extracted text for page 78
Unverified text extraction. Check the original page for numbers, names, and layout.
ORDINANCE NO. 1138 Page 7 of 19 (51) Waste site is an area where material from a construction site is disposed. When the material is erodible, such as soil, the site must be treated as a construction site. (52) Waters (or waters of the state) means any and all water, public or private, on or beneath the surface of the ground, which are contained within, flow through, or border upon Tennessee or any portion thereof, except those bodies of water confined to and retained within the limits of private property in single ownership which do not combine or effect a junction with natural surface or underground waters. (53) Wat ers with unavailable parameters means any segment of surface waters that has been identified by the TDEC as failing to support one or more classified uses. Unavailable parameters exist where water quality is at, or fails to meet, the levels specified in water quality criteria in Rule 0400-40-03-.03, even if caused by natural conditions. In the case of a criterion that is a single response variable or is derived from measurement of multiple response variables, the unavailable parameters shall be the agents causing water quality to be at or failing to meet the levels specified in criteria. Resources to be used in making this determination include biennial compilations of impaired waters, databases of assessment information, updated GIS coverages (https://tdeconline.tn.gov/dwr/), and the results of recent field surveys. GIS coverages of the streams and lakes not meeting water quality standards, plus the biennial list of waters with unavailable parameters, can be found at https://www.tn.gov/environment/program- areas/wr-water-resources/water-quality/water-quality-reports---publications.html. (54) Water quality riparian buffer means a permanent strip of natural perennial vegetation adjacent to a stream, river, wetland, pond, or lake that contains dense vegetation made up of grass, shrubs, and/or trees. The purpose of a water quality riparian buffer is to maintain existing water quality by minimizing the risk of any potential sediments, nutrients, or other pollutants reaching adjacent surface waters and to further prevent negative water quality impacts by providing canopy over adjacent waters. (55) A one-week period is a synonym of a calendar-week; typically, a period from Sunday through Saturday (56) Water quality treatment volume (WQTV) is a portion of the runoff generated from impervious surfaces at a new development or redevelopment project by the 1-year 24- hour design storm. The WQTV is further determined by the type of treatment provided. (57) Wet weather conveyances are man-made or natural watercourses, including natural watercourses that have been modified by channelization, that meet the following: (a) The conveyance carries flow only in direct response to precipitation runoff in its immediate locality. (b) The conveyance’s channels are at all times above the groundwater table. (c) The flow carried by the conveyance is not suitable for drinking water supplies. 14-503. Construction Stormwater Management: D esign, Construction, and Inspection. (1) MS4 Stormwater Construction BMP Manual. (a) Adoption. The City of Athens adopts, as its MS4 stormwater construction BMP manual(s), the following publication(s) which are incorporated by reference in this ordinance as if fully set out herein: (i.) Metropolitan Nashville – Davidson County Stormwater Management Manual as amended; or, (ii.) City of Knoxville Stormwater BMP Manual as amended; or, 72