2025 3 18 Packet 2
City Council · packet · 143 pages · Descriptive metadata inferred from filename
Extracted text for page 65
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS TO: Ran dall Dowling, City Manager FROM: Kevin L. Helms, Project Manager/Interim Public Works Director Cc: Ben Burchfield, Public Works Director DATE: March 4, 2025 SUBJECT: Traffic Signal Modernization Program (TSMP) Grant Summ ary • C ontrollers & Conflict Monitors • Controller Cabinet & Equipment • Signal Heads & Flashing Beacons • Supplemental Signal Heads • Ped Signal Heads & Push Buttons • Advance & Stop Line Detection • Signal Timing Optimization Plans • School Zone Flashing Beacons The up grades provided through these grant funds are intended to: • Reduce crashes • Reduce traffic congestion • Increase detection reliability • Improve traffic signal visibility The Public Works Department proposes to use the grant funds at the following intersections: • White Street & Elizabeth Street • White Street & Park Street • Green Street & Jackson Street • Green Street & Madison Avenue • Green Street & Ingleside Avenue/Washington Avenue The g rant provides funding for projects up to a maximum of $125,000. Additionally, engineering services are provided by TDOT staff or a TDOT oncall engineering firm and the cost of these services do not count toward the maximum grant contribution. The grant covers 100% of the project cost up t o the g rant maximum and the City would only be required to provide funding if the total exceeds $125,000. 59