2023 04 18 City Council agenda packet
City Council · packet · 54 pages · Descriptive metadata inferred from filename
Extracted text for page 18
Machine-read OCR text; verify every number, name, and layout against the original page.
PUBLIC WORKS MEMORANDUM TO: Mike Keith, Interim City Manager FROM: Ben Burchfield, Public Works Director DATE: April 5, 2023 SUBJECT: CTI Change Order Request Adams Construction is moving quickly towards completion of the roadway improvements package on the Athens Campus Transportation Improvements project started earlier this year. They are tentatively planning to complete sidewalk improvements in ~3 weeks weather permitting. As part of the roadway improvements, there were several existing stormwater catch-basins located along McMinn Ave and Crestway Dr that, during the course of construction, were excavated and planned for repairs. It has been determined that the original design plans for retrofit/replacement will not work as planned, and so an alternate stormwater catch-basin design has been substituted in order to both accommodate the new sidewalk and altered roadway sections. This COR is time sensitive due to the need to procure materials and complete the work while Adams is still on-site, otherwise there may be a need to remobilize which would carry additional cost. Adams has provided a breakdown of the change order request (COR) as follows: 1. Materials $6,948.59 2. Labor $5,091.00 3. Equipment $6,336.00 4. Total /w bond increase $18,651.22 Public Works is requesting Council approval to increase the approved contract amount with Adams Construction to account for the required change. Let me know if you have any questions. 16