2023 04 18 City Council agenda packet
City Council · packet · 54 pages · Descriptive metadata inferred from filename
Extracted text for page 17
Machine-read OCR text; verify every number, name, and layout against the original page.
PUBLIC WORKS TO: Mike Keith, Finance Director/Interim City Manager FROM: Kevin L. Helms, Project Manager Ce: Ben Burchfield, Public Works Director DATE: April 4, 2023 SUBJECT: Public Works Facility Background Council originally approved a total contract amount of $2,515,000.00 with Integrated Properties for the Public Works Facility construction project. The final amount to be paid by the City to Integrated Properties will be $2,516,215.00 once the final payment is made. This results in an overrun of $1,215.00. The cause of the overrun was due to a change in the floor coating applied to the concrete floor in the administrative building. The original product installed was not durable enough to withstand the type of foot traffic our building gets. As a result, a second product was applied which is much more durable and should give improved long lasting results. However, it should be noted that during the course of construction a dispute arose over areas which had been called out to receive paint. After discussing the issue, the architects accepted responsibility for this error and applied a credit of $6,028.60 toward the professional services fees. Therefore if you take both contracts into consideration the project came in $4,813.60 under what was approved for both contracts. Action Item We recommend Council approve an amendment in the amount of $1,215.00 to the contract with Integrated Properties so that we can close out this project. This increase will be more than offset by the credit mentioned above as provided by the architectural firm. 15