2025 4 15 Regular Session PACKET 1
City Council · packet · 119 pages · Descriptive metadata inferred from filename
Extracted text for page 35
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item VIII. C Approve Proposal from Gresham Smith Engineers to Design, Assist in Bidding, and Provide Construction Administration for a Storm Water Improvement Project Overview During 2023, the city received a grant from the Tennessee Dept. of Environment and Conservation funded by federal American Rescue Plan (ARP) funds to prepare a city- wide storm water management plan to determine storm water needs. The grant award was $2,371,902 (85%). With the city match of 15%, the total project budget is $2,727,688. Of the total project budget, $1,980,000 was allocated for a storm water construction project as identified in the plan. After a Request for Qualification (RFQ) process, Gresham Smith Engineers was selected to develop the storm water management plan and oversee the construction project. Gresham Smith Engineers has completed most of the storm water management plan and that pl an is expected to be fully completed and presented to the City Council by late 2025. The construction project that has been identified in the plan is to create a type of manmade wetland along the Oostanaula Creek at the corner of Forrest Avenue and Ingleside Avenue to improve water quality in the creek while also reducing downstream flooding during heavy rain events. Attached is a proposal from Gresham Smith Engineers to perform various services including surveying, wetland delineation, permitting, design, assist with bidding, and provide construction administration for the project at a cos t of $115,100. The construction portion of the project generally consists of acquiring the needed property and implementing the design to be completed by September 2026 at an estimated cost of $1,980,000. Both of these costs will be included in the upcoming FY 2025-26 budget. Attached is a memo from Public Works and the proposal with a concept plan. Following discussion during the April 7, 2025 work session, the consensus was to place this item on the April 15, 2025 regular session consent agenda for approval. Action to Consider Motion, second, and vote are needed to approve the proposal from Gresham Smith Engineers for them to survey, design, permit, assist with bidding, and provide construction administration for a stormwater project for a fee of $115,100. The construction expenses of the project will be included in next year’s budget. Affected Departments Public Works Dept. 29