Check the scanned record
Compare the original on the left with machine-read text on the right. Start with the first three examples, then continue through the sample.
Your first review is saved below. Proposed revisions remain unverified. Tell us the item number and any further corrections; this page does not submit new decisions.
Item 14 of 46 · PDF page 28
2023-07-18-City-Council-Meeting-Packet.pdf · 2023
Check names, dates, amounts, votes, and reading order. Blank pages and diagrams may legitimately have little searchable text.
Saved review: No specific feedback recorded · No explicit feedback for this item; the financial-table observation was corrected to item 15.
Original scanned page
Machine-read text
Unverified · 1,637 characters
Matt - See below for some quick take off / estimates for the Ingleside Pickleball overlay. As we discussed yesterday, there would need to be some design decisions made regarding the renovation. We may want to go ahead and fully remove the posts to better access and resurface the whole court area. | included a 5% contingency on all contractor supplied items. | didn't include shade structures (115k), but that can be added if desired and potentially installed in house to save mark up. best, db Clearing/Grubbing - AL $15,000. Typical line item that contractors use for site prep. Clearing/grubbing/mobilization. Site prep which includes removal. Demolition is also a factor. Prep work for making a lay down area to put all of their equipment. Parking lot and sidewalk - $105,000. This has contingency Removal and replacement of sidewalk (access) - 2,900 sf @ 10/sf - $29,000 Fencing (remove / replace approx. 10' perimeter) - 670 If @50/If - $33,500 LED upgrades (both tennis / pickleball) - $125,000. Lighting number from Musco from our original pickleball numbers. If they are only replacing the light fixtures, 4° high fencing - 420 If @ 60 / If - $25,200. Court surfacing (asphalt and sports coating) 27,000 sf @ 6/sf - 162,000. $6/square foot is on the high side but this is a number for contingency. This is to accommodate for any unforeseen circumstances. SUBTOTAL: $494,700 Mobilization (5%) - $24,735 + $494,700 = $519,435.00 By Owner (City of Athens) Benches - 16 @1,500 ea. - $24,000 Nets 12 - @ $2,500 - $30,000 Windscreen - (approx) 850 If @ 20 / If - $17,000 Subtotal: $71,000 +$519,435 = $590,435.00 26
The sample contains 100 pages: these 46 required OCR; the other 54 retained native text. Longer text does not establish accuracy.
Return to archive coverage