2025 10 21 Regular Session Packet
City Council · packet · 162 pages · Descriptive metadata inferred from filename
Extracted text for page 40
Machine-read OCR text; verify every number, name, and layout against the original page.
DRAFT - Preliminary Capital Budget - Scheme A - 4 - Rev. Athens City Hall Remodel - Addition Athens, TN September 16, 2025 Remodel Remodel Area Budget Building Remodel Areas 1 Light 7,135 1,070,250 2 Medium 6,924 1,384,800 3 Heavy 1,615 403,750 4,7 Council/ Court 1,452 508,200 Police Center Addition 7,284 3,459,900 Fire Station Bay Extention 0 0 24,410 6,826,900 Design and Construction Costs Building Construction 5,6 Remodel Construction $ 3,367,000.00 Addition Construction § 3,459,900.00 Special Building Features 8 Roofing Repair $ 50,000.00 Building Subtotal 3 6,876,900.00 Site Development 9 General Site Development $ 150,000.00 10 Front Ramp/ Stairs $ 100,000.00 | Fire Station Apron Repair $ 50,000.00 Sitework Subtotal $ 300,000.00 Total Construction Costs $ 7,176,900.00 Professional Services 12 Architectural and Engineering @ 7.5% (Allen & Hoshall) $ 538,268.00 13 Topographical Survey - (TBD) $ 15,000.00 14 Geotechincal Engineer/Soils Report - (TBD) $ 10,000.00 15 3rd Party Testing - (TBD) $ 30,000.00 16 Hazardous Material Testing- (TBD) $ 15,000.00 Professional Services Subtotal $ 608,268.00 Design and Construction Subtotal $ 7,785,168.00 Miscellaneous Costs 17 Design Review Fee ( if required and typically owner paid) $ 1,000.00 18 Furniture and Office Equipment $ 100,000.00 19 Construction Contingency Allowance (Owner changes/ hidden cond/etc) $ 358,845.00 Subtotal $ 459,845.00 Total Project Cost § 8,245,013.00 28