2025 10 21 Regular Session Packet
City Council · packet · 162 pages · Descriptive metadata inferred from filename
Extracted text for page 154
Unverified text extraction. Check the original page for numbers, names, and layout.
6 No. Program/Cost/Funding Source Responsible Party Status Public Works Department (continued) 39 Resurface 9 city streets totaling 3.94 miles using STBG-L funds, $999,000 and Capital Improvement Funds, $1,068,000 for a total of $2,067,000. • Mt. Verd Rd. from Clearwater Rd to city limits (.34) • Sharp Rd. from Velma Rd. to Railroad Ave (.21) • Tellico Ave. from Congress to Astrid St (.83) • Dennis St. from Congress to Decatur Pike (.62) • Woodward Ave. from N. Jackson St. to Ingleside Ave (1.07) • Forrest Ave. from Ingleside Ave. to Madison Ave (.29) • Guille St. from Ingleside Ave. to Eastanallee Ave (.12) • Glendale Ave. from Park St. to Cedar Springs Rd (.29) • Cedar Springs Rd. from Glendale Ave. to Elizabeth St (.17). Public Works Director / Project Manager City Council approved the 9 list of streets during April 2022, Gresham Smith Engineers completed final design/construction drawings and submitted to TDOT for approval. TDOT approved during June, 2025. Bid deadline was July 23, 2025, 3 bids received. On Aug. 11, 2025 work session for consideration and approved on Aug. 19, 2025 regular session. Preconstruction meeting held Sept. 12, 2025. Completion of Mt. Verd Road and Forrest Avenue Oct. 2025, remaining streets anticipated Spring 2026 40 Improve/stabilize/realign N. Jackson St. in front of City Hall using Capital Improvement Funds, $480,000. Public Works Director / Project Manager Gresham Smith Engineers has conducted geotechnical analysis, prepared design plans, and construction cost estimates. Will bid with View Street paving. 41 Have Stancell Electric implement Decatur Pike corridor traffic signal retiming study using Capital Improvement Funds, $193,000. Public Works Director / Project Manager Equipment purchase and installation on Sept. 8 , 2025 work session for consideration and approved on Sept . 16, 2025 regular session . Equipment ordered. 42 Improve the road and railroad intersection of W. Madison, Rocky Mount, and Old Riceville Road using Railroad Grade Crossing Program Grant, $600,000. Public Works Director / Project Manager Design completed. Project contract received and executed by city and TDOT. Preparing bid documents. 43 Prepare an electronic inventory/data base of major city storm water assets of location, size, and condition to determine stormwater needs. Then design and construct needed improvements, $2,503,000 using ARPA grant funds (85% grant/15% local). This study is a precursor to creating a storm water utility. Public Works Director / Project Manager Gresham Smith Engineers has collected all data. Bid opening was Sept. 9, 2025, Bid approved on Sept. 16, 2025 regular session. Project must be completed by Sept. 2026. Precon meeting held Oct. 10, 2025. 44 Improve intersection of Ingleside Ave. / Tellico Ave. using state Rural Safety Action grant, $927,000. Public Works Director / Project Manager Waiting for TDOT to approve funding. 45 Purchase/install routing software/hardware for garbage trucks, $44,948 over three years. Public Works Director / Sanitation Coordinator Council consented during Dec. 9, 2024 work session and approved during Dec. 17, 2024 regular session. Vendor is configuring software and all data being validated. Deployment during Fall 2025. 139