2022 11 15 City Council
City Council · packet · 94 pages · Descriptive metadata inferred from filename
Extracted text for page 18
Machine-read OCR text; verify every number, name, and layout against the original page.
We are in the position to replace the pipe with our crews but will need to purchase the materials. Contech Engineer Solutions has a state contract for the 48” corrugated metal pipe that is required for this project. The purchase can be made through the Tennessee State Contract Purchasing agreement with Contech. The estimated cost for pipe materials is $55,068.00. The cost of the materials is reimbursable through the ARPA funding because this project is part of the original scope of work. 16