Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2022 11 15 City Council

City Council · packet · 94 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 16

Machine-read OCR text; verify every number, name, and layout against the original page.

MEMORANDUM

TO: Ben Burchfield, Public Works Director
FROM: April Johnston, Street Superintendent
DATE: October 24, 2022

SUBJECT: Stormwater Pipe Replacement Project

Stormwater Pipe that runs from Howard Street to Cleveland Avenue was inspected recently as part of information
gathering for applying for ARPA stormwater funds. It was discovered that a section of this pipe had collapsed and poses
threat of property damage if not repaired quickly. During that inspection the rest of the pipe was discovered to be in
bad condition. The pictures below show the collapse at ground level on the Howard Street side. This is located on the
property line between David and Sandra Wilkey’s property and the Athens Housing Authority property.

14