2025 06 09 Work Session Packet 1
City Council · packet · 202 pages · Descriptive metadata inferred from filename
Extracted text for page 86
Unverified text extraction. Check the original page for numbers, names, and layout.
83 FY 2030 Estimated Cost Vehicles Total Vehicles - Cap ital Projects Permanent Flow Monitor Installation 250,000 Oost WWTP - Strip/paint influent and transfer pump st 400,000 NMC WWTP - Replace Septage Receiving Unit 250,000 Total Capital Projects 900,000 Co ntinuous Items Oostanaula WWTP Refurbishment 200,000 NMC WWTP Refurbishment 100,000 Admin and Operators Buildings Maint. - Oost. 15,000 Laboratory Equipment 15,000 Lift Station Rehabilitation 50,000 Field and Safety Equipment 20,000 Collection System Rehab 750,000 Material Donations 5,000 Technology (SCADA, Computers) 35,000 Services 500,000 Extensions 25,000 Grinder Pump Core Replacements 140,000 Manhole Rehabilitation 30,000 Rehabilitation of Services 75,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 1,980,000 Vehicles - Capital Projects 900,000 Continuous Items 1,980,000 Total 2,880,000 84