2025 06 09 Work Session Packet 1
City Council · packet · 202 pages · Descriptive metadata inferred from filename
Extracted text for page 64
Unverified text extraction. Check the original page for numbers, names, and layout.
61 FY 2028 Estimated Cost Vehicles Replace Truck 16 (service truck) 125,000 Total Vehicles 125,000 Capital Projects Replace CI Water Line Crossing (Rocky Mount Ro 250,000 Matlock Phase 2 - Crestway to Cedar Springs 1200000 Install Aerator in Tank #2 60,000 WTP - Re-pave Parking / Regrade Yard & Fencin 150,000 AMI Project 575,000 Total Capital Projects 2,235,000 Continuous Items Water Plant Maint and Lab Equipment 50,000 Meter Change Out (Large, Small and Testing) 40,000 Reservoir and Pump Maintenance 40,000 Water Line Extensions 200,000 Distribution Rehabilitation 200,000 Field and Safety Equipment 25,000 Water Services 250,000 Technology (SCADA, Computers) 35,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 860,000 Vehicles 125,000 Capital Projects 2,235,000 Continuous Items 860,000 Total 3,220,000 62