60 FY 2027 Estimated Cost Vehicles Lowboy Trailer 60,000 Backhoe 150,000 Total Vehicles 210,000 Capital Projects Sandblast and Re-Paint Reservoir #2 120,000 Diesel Generator for WTP 500,000 Matlock Phase 1 - Madison to Crestway 1,100,000 AMI Project 575,000 Total Capital Projects 2,295,000 Continuous Items Water Plant Maint and Lab Equipment 50,000 Meter Change Out (Large, Small and Testing) 30,000 Reservoir and Pump Maintenance 40,000 Water Line Extensions 200,000 Distribution Rehabilitation 200,000 Field and Safety Equipment 25,000 Water Services 250,000 Technology (SCADA, Computers) 35,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 850,000 Vehicles 210,000 Capital Projects 2,295,000 Continuous Items 850,000 Total 3,355,000 61