2025 06 09 Work Session Packet 1
City Council · packet · 202 pages · Descriptive metadata inferred from filename
Extracted text for page 27
Unverified text extraction. Check the original page for numbers, names, and layout.
24 Capital Budget Water Division Cash Available for Investment in Plant 18,090,974 Capital Expenditures: Replace Truck #88 (Single Axle Dump) 150,000 Truck #63 (2007) 60,000 Replace Truck #59 100,000 Tank #3 Removal 70,000 Spare Well Pumps 50,000 Replace Buildings at Wells #7, #4 - Add Metering 130,000 Vehicles 310,000 Raw Water Line Bore under Oost. Creek 75,000 Capital Projects 8,385,000 Ingleside Ave @ Woodward - replace 8" CI Crossing 155,000 Continuous 886,893 Congress Pkwy - Tractor Supply to Million St. 350,000 9,581,893 Replace Crossing Congress Pkwy (RR Ave to Clearwater) 450,000 Locker Room Improvements 30,000 AMI Project 575,000 Tank #6 6,500,000 * Water Plant Maint and Lab Equipment 50,000 Continuous Meter Change Out (Large, Small and Testing) 30,000 Continuous Reservoir and Pump Maintenance 40,000 Continuous Water Line Extensions 200,000 Continuous Distribution Rehabilitation 200,000 Continuous Field and Safety Equipment 25,000 Continuous Water Services 250,000 Continuous Technology (SCADA, Computers) 35,000 Continuous IT Core (Servers, mainframe, etc.) 56,893 Continuous 9,581,893 Exces s Cas h after Plant Inves tments 8,509,081 25