2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 73
Unverified text extraction. Check the original page for numbers, names, and layout.
Athens Fire Station No. 3 - Construction Materials Testing Services July 9, 2026 TeamUES.com | 3 Masonry Wall Construction Observations: Our personnel can observe masonry wall construction on a periodic basis (as directed and coordinated by your onsite representative) and document block size and placement; and reinforcing steel size, spacing, location, lap lengths, and general orientation. Grout Testing : During grout placement in masonry wa lls, our personnel can sample and cast representative samples. After the initial curing on site, the samples will be transported to our laboratory for additional curing and compressive strength testing. Observations during MSE Wall Construction: Our personnel can observe the installation of the retaining wall during construction. Our services will include observing and documenting the various retaining wall components (i.e., geogrid, segmental blocks, backfill placement) and documenting whether or not they are installed in general accordance with the retaining wall design plans. We will need direction from you, as to whether these observations are provided on a periodic or full-time basis. Field Density Testing of Basestone : After the basestone is placed and compacted our personnel can perform field density testing of the in-place basest one. Our personnel will record moisture content, compacted density and the approximate test location. Reporting: At the completion of each site visit, our personnel will prepare a daily field report. This report will summarize our field personnel's prelimin ary observations and testing results. The field personnel’s information will be delivered to our office, reviewed by a UES project manager, and issued in a typed format. LABORATORY ACCREDITATION UES participates and maintains AASHTO Accreditation through the re:source and CCRL certification programs. This accreditation conf irms our laboratory meets or exceeds the requirements outlined in ASTM E329 for materials testing and inspection laboratories. Confirmation of our accreditation is shown on the re:source website at http://www.aashtoresource.org. EXCLUSIONS The following items are specifically excluded from our scope of services: 1. Surveying of test locations and elevations. 2. Providing a curing environment for the initial 24 to 48 hours for the concrete cylinders. 3. Directing the means and methods of the project subcontractors. 4. Items not discussed above. 5. Construction Management. 6. Civil/Architectural design services. 71