2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 65
Unverified text extraction. Check the original page for numbers, names, and layout.
Mr. Burchfield, January 26, 2026, Page 8 kimley-horn.com 10 Lea Avenue, Suite 400, Nashville, TN 37210 615 564 2701 Task 9.2 – Final Utility Coordination Upon completion of Task 5, Kimley-Horn will submit Right-of-Way Plans to the identified utility owners within the project limits. The submittal to each utility owner will consist of an electronic set of plan drawings (PDF format) and a letter requesting that the utility company review the potential impacts of the proposed project to their facilities. The letter will request preliminary relocation plans from each utility and will also request that the utility company identify any private utility easements that fall within the project limits but are not shown on the Right-of-Way plans. Kimley-Horn will prepare for and host a utility coordination meeting as part of this task. Known impacted utility companies will be invited to attend a coordination meeting to discuss potential utility relocations within the project limits. Kimley -Horn will document the discussions and decisions made during the meeting and distribute to the meeting attendees. Utility Owners will be responsible for identifying utility conflicts within the project limits and the design and relocation of their utilities. During the Final Design phase, if there are any changes made to the proposed design plans that will impact final utility relocation plans, Kimley-Horn will submit the revised plans to the utility owners. Via this task, utility companies will also be invited to attend the final plans review meeting. Kimley-Horn will not perform any utility relocation design services as part of this task. It is assumed that each utility owner will design, provide plans for, and construct their utility relocations. Task 10 – Bid Phase Services Task 10.1 – Proposal Contract Preparation Kimley-Horn will prepare a proposal contract in accordance with TDOT and City of Athens standards. Kimley-Horn will prepare technical specifications for those items that are not covered by TDOT or City of Athens specifications. The remainder of the technical specifications will be based upon TDOT’s Standard Specifications for Road and Bridge Construction or will be documented in the construction plans. The proposal contract will contain the Request for Proposals, the contract documents, bid forms, specifications, and required special provisions. The proposal contract will be submitted to the City of Athens for review and Kimley-Horn will revise the proposal contract based on up to one (1) round of comments received. Task 10.2 – Bid Assistance Kimley-Horn will attend one pre -bid meeting with the City and potential bidders and respond to questions that arise during the bidding process. Kimley-Horn will attend the bid opening and summarize and tabulate contractor bids. Kimley -Horn will submit bid tabulation documentation and recommendations for bid acceptance or rejection to the City. Task 10 Kimley-Horn Deliverables: 1. Draft Proposal Contract (one electronic copy, PDF format) 2. Final Proposal Contract (one electronic copy, PDF format) 3. Responses to bidder questions (one electronic copy, PDF format) 4. Bid tabulations documentation (one electronic copy, PDF and Excel formats) 63