2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 64
Unverified text extraction. Check the original page for numbers, names, and layout.
Mr. Burchfield, January 26, 2026, Page 7 kimley-horn.com 10 Lea Avenue, Suite 400, Nashville, TN 37210 615 564 2701 Task 7 Kimley-Horn Deliverables: 1. 90% construction plans for City review (one electronic copy, PDF format) 2. Agenda and meeting minutes for design review meeting (one electronic copy, PDF format) 3. Final sealed plans for bidding (one full -size hard copy, two half -size hard copies, and one electronic copy, PDF format) 4. Final engineer’s opinion of probable construction cost (one electronic copy, PDF format) 5. TDOT Highway Entrance Permit Application (one electronic copy, PDF format) Task 8 – Environmental Permitting Task 8.1 – Stormwater Pollution Prevention Plan (SWPPP) Kimley-Horn will prepare and submit the Storm Water Pollution Prevention Plan (SWPPP) permit documents required by TDEC for the land disturbance activities associated with this project. The SWPPP will consist of drawings and a technical narrative describi ng erosion and sediment control measures that should be implemented during construction to reduce the negative downstream impacts due to pollutant run-off related to construction activities. Kimley-Horn will submit the SWPPP document to TDEC for review. Kimley-Horn will revise the SWPPP document in accordance with comments received from TDEC and will resubmit a final SWPPP document to TDEC for approval. The City of Athens shall be responsible for all permitting and review fees associated with this task. Task 8.2 – NPDES Permit Application Based on the assumed impact of the project improvements on the surrounding environment, it is assumed that a National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction Activity will be req uired for the project. Kimley -Horn will prepare the NPDES General Permit application and will submit it to TDEC along with the approved SWPPP document for processing by TDEC. Preparation of technical studies or applications for other project-specific environmental permits are not part of this task. If additional environmental permits are required by TDEC, USACE, or any other agency, those permits can be provided by Kimley-Horn in accordance with Additional Services clause of this agreement. Task 8 Kimley-Horn Deliverables: 1. Draft Project SWPPP (one electronic copy, PDF format) to Client and TDEC 2. Final Project SWPPP (one electronic copy, PDF format) to Client and TDEC 3. NPDES Permit Application (one electronic copy, PDF format) to Client and TDEC Task 9 – Utility Coordination Task 9.1 – Early Utility Coordination Upon receiving a notice to proceed, Kimley -Horn will provide a notification to the potentially affected utility owners along the project corridor. The notification to each utility owner will consist of project map and a letter requesting that the utility company review the project map to determine if they own facilities within the project limits. The letter will request a written response from each utility. 62