2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 63
Unverified text extraction. Check the original page for numbers, names, and layout.
Mr. Burchfield, January 26, 2026, Page 6 kimley-horn.com 10 Lea Avenue, Suite 400, Nashville, TN 37210 615 564 2701 ▪ Proposed Layout ▪ Mainline/Sideroad Profiles ▪ Driveway Profiles ▪ Drainage Map ▪ Erosion Prevention and Sediment Control Plans ▪ Signing and Pavement Marking Plan ▪ Roadway Cross Sections ▪ Traffic Signal Plans ▪ ITS Plans Task 7.2 – 90% Construction Plans Submittal and Review Kimley-Horn will submit 90% construction plans to the City for review and comment. Kimley-Horn will meet with the City to discuss the City’s comments . Kimley-Horn will document the comments and decisions in meeting minutes that will be distributed to all attendees of the review meeting. Task 7.3 – Final (100%) Construction Plans Revisions and Submittal Following review of the 90% construction plans, Kimley-Horn will revise the plans based on up to one (1) round of comments received. Kimley -Horn will prepare a set of final (100%) construction plans to the City for approval and bidding. The final construction plans will be signed and sealed by a State of Tennessee licensed Professional Engineer. Task 7.4 – Final Engineer’s Opinion of Probable Construction Cost Kimley-Horn will prepare an opinion of the probable construction cost of the proposed improvements defined by the plans and technical specifications. Quantities will be those developed from the Construction plans. Kimley-Horn will base this opinion of cost on actual bid prices for recent projects which involved similar equipment and construction. Because Kimley-Horn does not control the cost of labor, materials, equipment or services furnished by others, methods of determining prices, or competitive bidding or market conditions, any opinions rendered as to costs, including but not limited to opinions as to the costs of construction and materials, shall be made on the basis of its experience and represent its judgment as an experienced and qualified professional, familiar with the industry. Kimley -Horn cannot and does not guarantee that proposals, bids or actual costs will not vary from its opinions of cost. If the City wishes greater assurance as to the amount of any cost, it shall employ an independent cost estimator. Kimley-Horn’s services required to bring costs within any limitation established by the City will be paid for as Additional Services. Task 7.5 – Final Design Permitting Due to Decatur Pike being a state route (SR-30), a TDOT Highway Entrance Permit will be required. Kimley-Horn will prepare the application for this permit and submit the application and construction plans to TDOT. If comments are received, Kimley-Horn will revise the plans based on the comments received and resubmit. Up to one (1) review cycle is assumed for this scope. If additional review cycles are required, they will be considered additional services. Once permits are approved, Kimley-Horn will submit all plan documentation to the City. 61