2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 56
Unverified text extraction. Check the original page for numbers, names, and layout.
PAY ITEM SUMMARY TDOT PAY ITEM TDOT DESCRIPTION UNIT TOOL QUANTITIES ADDITIONAL QUANTITIES TOOL QUANTITIES + ADDITIONAL Unit Price TOTAL COST Pavment Removal 415-01.02 COLD PLANING BITUMINOUS PAVEMENT SY 1502 1600 3102 9.60$ 29,777.92$ PAVEMENT REMOVAL TOTAL (ROUNDED) 29,800$ Asphalt Roads 303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D TON 1044 175 1219 40.60$ 49,501.55$ 307-(01, 02, 03).01 ASPHALT CONCRETE MIX (All Grades) (BPMB-HM) GRADING A TON 134 150 284 124.26$ 35,314.19$ 307-01.(20 & 21 & 22) AGGREGATE (BPMB-HM) GRADING A-S MIX TON 105 100 205 124.27$ 25,477.29$ 307-(01 & 02 & 03).08 ASPHALT CONCRETE MIX (ALL GRADES) (BPMB-HM) GRADING B-M2 TON 88 85 173 130.99$ 22,648.01$ 402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC) TON 1 1 978.20$ 1,054.15$ 402-02 AGGREGATE FOR COVER MATERIAL (PC) TON 4 4 75.90$ 295.22$ 403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC) TON 1 1 974.85$ 1,133.08$ 411-(01 & 02 & 03).10 ACS MIX(ALL GRADES) GRADING D TON 164 90 254 146.95$ 37,304.87$ PAVING TOTAL (ROUNDED) 172,800$ Concrete Roads CONCRETE RAMPS AND ROADWAYS TOTAL (ROUNDED) -$ Drainage 607-05.02 24" CONCRETE PIPE CULVERT (CLASS III) LF 77 250 327 137.55$ 45,014.61$ 611-07.01 CLASS A CONCRETE (PIPE ENDWALLS) CY 4 4 2,156.18$ 8,886.91$ 611-07.02 STEEL BAR REINFORCEMENT (PIPE ENDWALLS) LB 392 392 4.08$ 1,598.05$ 611-42.02 CATCH BASINS, TYPE 42, > 4' - 8' DEPTH EA 0 2 2 8,249.02$ 16,498.04$ 710-02 Aggregate Underdrains (with pipe) LF 676 676 13.31$ 8,995.43$ DRAINAGE TOTAL (ROUNDED) 81,000$ Appurtenances ROADWAY AND PAVEMENT APPURTENANCES TOTAL (ROUNDED) -$ Earthwork & Mineral 203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) CY 1163 1163 17.18$ 19,980.48$ 203-03 BORROW EXCAVATION (UNCLASSIFIED) CY 945 945 19.30$ 18,237.42$ 203-50 CONSTRUCTION OF HAUL ROAD LS 1 1 -$ -$ EARTHWORK & MINERAL TOTAL (ROUNDED) 38,300$ Construction Lines and Stakes 105-01 Construction Lines and Stakes LS 1 1 30,000.00$ 30,000$ Structures STRUCTURES TOTAL (ROUNDED) -$ Interchanges and Unique Intersections INTERCHANGES AND UNIQUE INTERSECTIONS TOTAL (ROUNDED) -$ Lighting & Signalization N/A Traffic Signal EA 0 1.25 1.25 312,500.00$ 390,625.00$ N/A ITS Installation Mi 0.094 0.094 1,000,000.00$ 94,000.00$ LIGHTING & SIGNALIZATION TOTAL (ROUNDED) 484,700$ Guardrail GUARDRAIL TOTAL (ROUNDED) -$ Seeding and Sodding 801-01 SEEDING (WITH MULCH) UNIT 51 51 65.16$ 3,302.83$ 801-01.07 TEMPORARY SEEDING (WITH MULCH) UNIT 38 38 45.90$ 1,744.93$ 801-02 SEEDING (WITHOUT MULCH) UNIT 38 38 42.23$ 1,605.42$ 54