2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 55
Unverified text extraction. Check the original page for numbers, names, and layout.
COST ESTIMATE SUMMARY Route: Termini: Scope of Work: Project Type of Work: County: Estimate Developed By Length: 0.13 Miles Initial/Organization Date: Estimate Type: Years Inflated: 0 LOCAL STATE FEDERAL 100% 0% 0% $29,800 $0 $0 $29,800 $173,000 $0 $0 $173,000 $0 $0 $0 $0 $81,000 $0 $0 $81,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $485,000 $0 $0 $485,000 $0 $0 $0 $0 $38,300 $0 $0 $38,300 $29,100 $0 $0 $29,100 $6,700 $0 $0 $6,700 $0 $0 $0 $0 $0 $0 $0 $0 $800 $0 $0 $800 $7,800 $0 $0 $7,800 $63,700 $0 $0 $63,700 $30,000 $0 $0 $30,000 Mobilization 5% $42,600 $0 $0 $42,600 Allowances 10% $85,200 $0 $0 $85,200 Const. Contingency (Structures Not Included) 30% $294,000 $0 $0 $294,000 Const. Eng. & Inspec. 10.0% $137,000 $0 $0 $137,000 $0 $0 $0 $1,500,000 LOCAL STATE FEDERAL 0% 0% 0% $0 $0 $0 $46,000 $0 $0 $0 $0 LOCAL STATE FEDERAL 0% 0% 0% Prelim. Eng. 15.0% $0 $0 $0 $205,000 $0 $0 $0 $ 1,750,000 TOTAL Construction Lines and Stakes Realign and widen Lee Irwin Road, extend left turn lane onto Lee Irwin Road, construct right turn lanes on Decatur Pike DESCRIPTION Realign and Widen McMinn Design-Bid-Build Right-of-Way & Utilties Asphalt Paving Concrete Pavement Drainage Appurtenances Structures & Contingency Fencing Construction Items Removal Items TOTAL Earthwork Clearing and Grubbing COST ESTIMATE SUMMARY Railroad Crossing Kimley-Horn Utilities Right-of-Way Signalization & Lighting Lee Irwin Road November 11, 2025 From Decatur Pike to existing Lee Irwin Road TOTAL Preliminary Engineering Seeding & Sodding Rip-Rap or Slope Protection Guardrail Signing Pavement Markings Traffic Control Construction Estimate - DBB & DB DESIGN-BID-BUILD & DESIGN-BUILD PERCENTAGES Design-Bid-Build Project Cost 53