2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 53
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS MEMORANDUM TO: Bridget Roberts, City Manager FROM: Ben Burchfield, Public Works Director DATE: Friday, July 10, 2026 SUBJECT: Lee Erwin Signalization Design Services Proposal Background The Public Works Department has completed improvements to the SR -30 corridor at exit 49 over the last 12 months for improved detection ; signalization modification to flashing -yellow arrows, and signal coordination to improve traffic flow during periods of increased demand . One item that was identified during the assessment, but that has yet to be completed is signalization of the intersection of Lee Erwin & Decatur Pike. A development group completed a traffic impact assessment in summer of 2023 and determined that virtually any permutation of commercial development uses around this intersection and will need improved traffic control via signalization. Additionally, there has been continued interest in development at both immediately adjacent parcels to the intersection as well as other nearby parcels that would contribute to demand at this intersection. Interested parties have communicated that signalization would be a much- desired catalyst for continued development. As such, Public Works Staff were requested to solicit a proposal for professional services to initiate this design in January 2026; and the proposal has been in stasis since. Council should be aware that design and construction of the signal is not currently identified within the CIP; however, it is the Department’ s understanding that Council will be revisiting the CIP and this would be an appropriate item to discuss whether to integrate into the CIP. Council should also understand that whether construction of improvements occurs sooner, or later, on a long enough timeline any development will drive signalization nee d, and this engineering work would position us to have a “shovel -ready” set of plans to construct improvements if needed assuming we do not proceed posthaste to construction after completion of bid documents. 51