2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 43
Unverified text extraction. Check the original page for numbers, names, and layout.
July 7, 2026, Page 4 kimley-horn.com 537 Market Street, Suite 202 Chattanooga, TN 37402 423 266 3501 • Installation details consisting of one-line diagram and panelboard schedules. It is understood that the lighting and photometric plans as well as pole and pole foundation design will be provided by others. Task 3.5 – Opinion of Probably Cost (OPC) K imley-Horn will provide an opinion of the probable construction cost to accompany the submittal plan set. The opinion of probable construction cost will be based on prices for recent projects which involved similar equipment and construction, to the extent that such information is available. Any opinions rendered as to costs, expenses, or revenue, including but not limited to opinion as to the costs of construction and materials, shall be made based on the Consultant’s experience and represent its judgement as an experienced and qualified professional, familiar with the industry. The Consultant cannot and does not guarantee that proposals, bids, actual costs, or revenues will not vary from its opinions. Task 3 Deliverables • Plan Set Including: Cover Sheet and Project Notes. Demolition Plan. Site Plan. Site Details. Grading Plan. Grading Details. Erosion Control Plan. Erosion Control Details. Landscape Plan. Landscape Details. Electrical Power Connectivity Plan. Electrical Power Connectivity Details. Hydrology Report. Opinion of Probable Cost Summary. KH has no control over the actions of jurisdictional agencies and is not a party to agreements between the client and others. Accordingly, professional opinions as to the status of permits and entitlements herein and professional opinions as to the probability and timeframe for approvals are made on the basis of professional experience and available data. The Consultant does not guarantee that the outcome of permits and entitlements will not vary from its opinions. Because its opinions are based upon limited site investigation and scope of services, the Consultant does not guarantee that all issues affecting the site have been investigated. Task 4 – Bid Phase Services Based on the Final Plans prepared under Task 3, Kimley-Horn will prepare a bid package in accordance with City of Athens standards. The bid package will contain the request for proposals, the contract documents, bid forms, disadvantaged business enterprise (DBE) requirements (if applicable), specifications, and required special provisions. The bid package will be submitted to the City of Athens 41