2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 38
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS TO: Bridget Roberts, Interim City Manager FROM: Kevin L. Helms, Project Manager Cc: Matt Siniard, Parks and Recreation Director Ben Burchfield, Public Works Director DATE: July 8, 2026 SUBJECT: Professional Services Agreement for Cook Park Parking Improvements Background The City Council recently requested that City staff investigate options to add parking at Cook Park. Staff delivered three concepts each with an estimated cost to Council for review. A fter narrowing the possibilities, staff met with community members who have a vested interest in the park to review those options. This meeting identified a preferred option among community members, which was subsequently presented to Council at its June meeting. Council then directed staff to solicit a professional services agreement from an engineering firm to provide design and bidding services for the selected concept. Because the Parks and Recreation Masterplan update is also being performed by Kimley -Horn and Associates (KHA), staff believes it is in the best interest of the City for the same firm to complete this project. Using a single consultant promotes consistency in park planning, improves coordination between the two efforts, reduces project startup time, and lowers overall design costs by eliminating duplication of effort. Once staff selected KHA as the firm to be recommended to Council for the Masterplan update, the firm was asked to submit a proposal to provide design and bidding services for this project. The design and bidding documents will consist of three primary components: • Parking area with access drive • Add alternate parking area • Lighting improvements for both the new and existing parking areas, as well as the primary pedestrian walkways Both parking areas have roughly the same number of parking spaces. As a reminder, th ere are currently 11 parking spaces at Cook Park. The base scope of work will add approximately 14 parking spaces, including two ADA-accessible spaces. The new parking area will be served by a one-way drive entering from Wabash and exiting onto E Harper Johnson. The add alternate would provide approximately 13 additional spaces accessed from the same one-way drive. While there may be justification for limiting the scope of construction once the costs are known, there is virtually no cost savings for reducing the scope of design. For this reason, staff recommends including the 36