Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2026 7 13 Work Session PACKET Council

City Council · packet · 132 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 28

Unverified text extraction. Check the original page for numbers, names, and layout.

Page 6 
kimley-horn.com 537 Market Street, Suite 202, Chattanooga, TN  423-266-3501 
 
Heritage Park (Existing concept and blueprints from current and recent construction) 
• Prepare concept plan, predominantly as-built conditions, based on existing concept 
and plans from current and recent construction 
• Include OPC for planned improvements which would be limited due to land availability, 
although a new walking trail may be included. 
Fisher Field 
• Prepare concept plan 
• Include OPC for planned improvements which would be limited due to land availability, 
though a new building and ADA improvements may need to be considered, as well as 
upgrades to existing field such as replacing existing lighting, fencing, regrading field, 
etc. 
Stormwater Site at Mayfield Lane (Existing concept drawing and blueprints from ongoing 
construction) 
• Prepare concept plan that will mostly be as built 
• Prepare high level OPC 
• Limited development potential due to land availability outside stormwater 
infrastructure
 
Community Center 
• Included in concept plan for North City School or Regional Park site but needs 
assessment
 
 
Note: For building related improvements, national averages for construction combined with 
recent relevant recent experience will be used in developing the OPC’s, but architectural level 
assessments or pricing is not included in this scope of work.
 
 
 
Additional Services 
Any services not specifically provided for in the above scope, as well as any changes in the scope the 
City requests, will be considered Additional Services and will be performed consistent with the hourly 
rates shown in the attached table. These hourly rates will be fixed for a period of 12 months from the 
date of execution of this scope and fee agreement. Additional Services Kimley-Horn can provide 
include, but are not limited to, the following: 
 
• 
Additional meetings beyond those outlined in the above scope 
• Additional analysis beyond the scope that is outlined above 
• Additional design beyond the scope that is outlined above 
• Grant writing and support  
• Additional site visits beyond those outlined in the above scope 
• Others as requested by the Client 
 
SCHEDULE 
 
26