2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 27
Unverified text extraction. Check the original page for numbers, names, and layout.
Page 5 kimley-horn.com 537 Market Street, Suite 202, Chattanooga, TN 423-266-3501 • Prepare concept plan, predominantly as-built conditions using plans from recent construction projects, including the planned parking improvements. • Inclusion of an area for a future amenity that may be more clearly identified through the public process. Ingleside Park • Prepare concept plan with potential changes at pool, skate park, existing building, and immediately adjacent to tennis courts. (note: plans exist for recent construction, as well as additional courts which were bid but not constructed) • Include OPC for improvements • Pool needs to be examined closely during Task 3.2 to determine whether replacement/expansion at this site or construction at another site is appropriate • Potential additions include tennis and/or pickleball court and replacement of existing building. Wetlands Trail • Prepare concept plan, predominantly as-built conditions • Include OPC for planned improvements which would be limited due to land availability Prof Powers Park • Prepare concept plan based on existing conditions drawing • Prepare detailed OPC for anticipated new and upgraded amenities • Many facilities need to be updated if they are to remain Eureka Trail • Prepare concept plan with greater detail based on the Bike & Ped Masterplan • Review and update OPC from Bike & Ped Masterplan • Prepare additional OPC for other proposed extensions, limited additional amenities Eco Park • Prepare concept plan • Include OPC for planned improvements which would be limited due to land availability, however lighting upgrades may be identified Regional Park • Prepare concept plan based on existing concepts, but 12 acre addition may need major updates. • Conference center not to be included unless the location is chosen for a future community center • Include OPC which will mostly be associated with upgrading existing amenities such as converting fields to turf or adding lights to existing fields, as identified in the above Tasks • Newly acquired 12 acres will be the primary location of new facilities though the potential is limited due to topography North City School Site • Prepare concept plan, site has significant development potential and may include a new pool or community center based on evaluation and public input • Include OPC 25