2026 7 13 Work Session PACKET Council
City Council · packet · 132 pages · Descriptive metadata inferred from filename
Extracted text for page 18
Unverified text extraction. Check the original page for numbers, names, and layout.
Unit Price Total Cost Unit Price Total Unit Price Total Unit Price Total 105-01 CONSTRUCTION STAKES, LINES AND GRADES LS 1 $40,000.00 $40,000.00 $25,000.00 $25,000.00 $9,000.00 $9,000.00 4,550.00$ 4,550.00$ 202-01.50 REMOVAL OF STRUCTURES AND OBSTRUCTIONS EACH 2 $1,500.00 $3,000.00 $2,500.00 $5,000.00 $3,500.00 $7,000.00 650.00$ 1,300.00$ 202-02.21 REMOVAL OF PIPE (12" RCP) L.F. 121 $15.00 $1,815.00 $18.00 $2,178.00 $50.00 $6,050.00 65.00$ 7,865.00$ 203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) C.Y. 476 $45.00 $21,420.00 $78.00 $37,128.00 $60.00 $28,560.00 45.50$ 21,658.00$ 203-04 PLACING AND SPREADING TOPSOIL C.Y. 83 $45.00 $3,735.00 $60.00 $4,980.00 $40.00 $3,320.00 91.00$ 7,553.00$ 203-06 WATER M.G. 3 $120.00 $360.00 $150.00 $450.00 $100.00 $300.00 1,170.00$ 3,510.00$ 209-05 SEDIMENT REMOVAL C.Y. 12 $20.00 $240.00 $40.00 $480.00 $10.00 $120.00 52.00$ 624.00$ 209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING) L.F. 352 $4.00 $1,408.00 $3.75 $1,320.00 $5.00 $1,760.00 4.25$ 1,496.00$ 209-08.07 ROCK CHECK DAM EACH 2 $1,100.00 $2,200.00 $725.00 $1,450.00 $900.00 $1,800.00 325.00$ 650.00$ 209-08.08 ENHANCED ROCK CHECK DAM EACH 2 $1,300.00 $2,600.00 $850.00 $1,700.00 $900.00 $1,800.00 650.00$ 1,300.00$ 209-09.43 CURB INLET PROTECTION (TYPE 4) EACH 1 $475.00 $475.00 $500.00 $500.00 $150.00 $150.00 400.00$ 400.00$ 303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D TON 434 $70.00 $30,380.00 $69.00 $29,946.00 $90.00 $39,060.00 110.50$ 47,957.00$ 307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM), GRADING BM-2 TON 138 $150.00 $20,700.00 $195.00 $26,910.00 $220.00 $30,360.00 383.50$ 52,923.00$ 403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC) TON 1 $1,100.00 $1,100.00 $1,404.00 $1,404.00 $1,490.00 $1,490.00 4,160.00$ 4,160.00$ 411-01.10 ACS MIX (PG64-22) GRADING D TON 64 $200.00 $12,800.00 $320.00 $20,480.00 $329.00 $21,056.00 403.00$ 25,792.00$ 607-02.02 15" CONCRETE PIPE CULVERT (CLASS III) L.F. 65 $180.00 $11,700.00 $145.00 $9,425.00 $210.00 $13,650.00 110.50$ 7,182.50$ 611-07.01 CLASS A CONCRETE (PIPE ENDWALLS) C.Y. 3 $2,600.00 $7,800.00 $1,485.00 $4,455.00 $3,530.00 $10,590.00 5,460.00$ 16,380.00$ 611-07.30 15IN ENDWALL (SIDEDRAIN) EACH 2 $4,500.00 $9,000.00 $2,500.00 $5,000.00 $4,450.00 $8,900.00 5,460.00$ 10,920.00$ 701-02 CONCRETE DRIVEWAY S.F. 693 $13.00 $9,009.00 $22.00 $15,246.00 $16.00 $11,088.00 15.00$ 10,395.00$ 702-01 CONCRETE CURB C.Y. 17 $1,500.00 $25,500.00 $750.00 $12,750.00 $1,200.00 $20,400.00 585.00$ 9,945.00$ 707-10.08 WIRE MESH (SD-MSE-1) S.Y. 8 $150.00 $1,200.00 $175.00 $1,400.00 $65.00 $520.00 15.00$ 120.00$ 709-05.05 MACHINED RIP-RAP (CLASS A-3) TON 100 $75.00 $7,500.00 $86.00 $8,600.00 $114.00 $11,400.00 104.00$ 10,400.00$ 709-05.06 MACHINED RIP-RAP (CLASS A-1) TON 82 $75.00 $6,150.00 $86.00 $7,052.00 $104.00 $8,528.00 104.00$ 8,528.00$ 713-02.21 SIGN POST DELINEATION ENHANCEMENT L.F. 6 $6.00 $36.00 $24.00 $144.00 $5.00 $30.00 16.00$ 96.00$ 713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST LB. 33 $6.00 $198.00 $5.50 $181.50 $5.00 $165.00 9.00$ 297.00$ 713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK) S.F. 7 $18.00 $126.00 $16.00 $112.00 $16.00 $112.00 25.00$ 175.00$ 717-01 MOBILIZATION LS 1 $60,000.00 $60,000.00 $25,000.00 $25,000.00 $50,000.00 $50,000.00 11,050.00$ 11,050.00$ 740-10.03 GEOTEXTILE (TYPE III) (EROSION CONTROL) S.Y. 275 $12.00 $3,300.00 $6.25 $1,718.75 $4.00 $1,100.00 29.00$ 7,975.00$ 740-11.02 TEMPORARY SEDIMENT TUBE 12IN L.F. 430 $5.00 $2,150.00 $3.50 $1,505.00 $9.00 $3,870.00 5.20$ 2,236.00$ 801-01 SEEDING (WITH MULCH) UNIT 3 $60.00 $180.00 $110.00 $330.00 $200.00 $600.00 1,950.00$ 5,850.00$ 801-01.07 TEMPORARY SEEDING (WITH MULCH) UNIT 2 $50.00 $100.00 $110.00 $220.00 $50.00 $100.00 325.00$ 650.00$ 801-02 SEEDING (WITHOUT MULCH) UNIT 4 $45.00 $180.00 $105.00 $420.00 $175.00 $700.00 325.00$ 1,300.00$ 801-03 WATER (SEEDING & SODDING) M.G. 1 $120.00 $120.00 $150.00 $150.00 $250.00 $250.00 1,560.00$ 1,560.00$ 805-12.02 EROSION CONTRL BLANKET (TYPE II) S.Y. 396 $2.00 $792.00 $4.40 $1,742.40 $4.00 $1,584.00 38.00 $ 15,048.00$ Sub Total = $287,274.00 $254,377.65 $295,413.00 $301,845.50 105-01 CONSTRUCTION STAKES, LINES AND GRADES LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $9,000.00 $9,000.00 4,030.00$ 4,030.00$ 202-03 REMOVAL OF RIGID PAVEMENT, SIDEWALK, ETC. S.Y. 24 $100.00 $2,400.00 $25.00 $600.00 $50.00 $1,200.00 35.10$ 842.40$ 202-03.01 REMOVAL OF ASPHALT PAVEMENT S.Y. 1072 $20.00 $21,440.00 $15.00 $16,080.00 $22.00 $23,584.00 29.25$ 31,356.00$ 202-08.10 REMOVAL OF CURB (CONCRETE CURB) L.F. 945 $20.00 $18,900.00 $7.00 $6,615.00 $16.00 $15,120.00 6.50$ 6,142.50$ 203-07 FURNISHING & SPREADING TOPSOIL C.Y. 141 $50.00 $7,050.00 $65.00 $9,165.00 $125.00 $17,625.00 110.50$ 15,580.50$ 209-05 SEDIMENT REMOVAL C.Y. 11 $20.00 $220.00 $40.00 $440.00 $10.00 $110.00 58.50$ 643.50$ 209-09.43 CURB INLET PROTECTION (TYPE 4) EACH 11 $475.00 $5,225.00 $500.00 $5,500.00 $150.00 $1,650.00 325.00$ 3,575.00$ 209-40.33 CATCH BASIN PROTECTION (TYPE D) EACH 1 $475.00 $475.00 $550.00 $550.00 $450.00 $450.00 1,040.00$ 1,040.00$ 303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D TON 108 $60.00 $6,480.00 $69.00 $7,452.00 $100.00 $10,800.00 106.60$ 11,512.80$ 307-01.08 ASPHALT CONCRETE MIX (PG64-22)(BPMB-HM) GRADING B-M2 TON 12 $180.00 $2,160.00 $836.00 $10,032.00 $581.00 $6,972.00 520.00$ 6,240.00$ 403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC) TON 3 $1,100.00 $3,300.00 $1,404.00 $4,212.00 $1,490.00 $4,470.00 3,120.00$ 9,360.00$ 407-20.05 SAW CUTTING ASPHALT PAVEMENT L.F. 1050 $6.25 $6,562.50 $8.50 $8,925.00 $5.00 $5,250.00 5.20$ 5,460.00$ 411-01.10 ACS MIX (PG64-22) GRADING D TON 484 $190.00 $91,960.00 $195.00 $94,380.00 $220.00 $106,480.00 403.00$ 195,052.00$ 415-01.02 COLD PLANING BITUMINOUS PAVEMENT S.Y. 6083 $6.00 $36,498.00 $5.75 $34,977.25 $10.00 $60,830.00 2.60$ 15,815.80$ 611-09.01 ADJUSTMENT OF EXISTING CATCH BASIN EACH 2 $4,500.00 $9,000.00 $3,000.00 $6,000.00 $3,430.00 $6,860.00 1,170.00$ 2,340.00$ 702-01 CONCRETE CURB C.Y. 6 $1,500.00 $9,000.00 $750.00 $4,500.00 $1,130.00 $6,780.00 795.60$ 4,773.60$ 709-05.05 MACHINED RIP-RAP (CLASS A-3) TON 50 $75.00 $3,750.00 $86.00 $4,300.00 $113.00 $5,650.00 110.50$ 5,525.00$ 712-01 TRAFFIC CONTROL LS 1 $20,000.00 $20,000.00 $16,500.00 $16,500.00 $20,000.00 $20,000.00 5,460.00$ 5,460.00$ 712-04.01 FLEXIBLE DRUMS (CHANNELIZING) EACH 69 $50.00 $3,450.00 $45.00 $3,105.00 $42.00 $2,898.00 37.05$ 2,556.45$ 712-06 SIGNS (CONSTRUCTION) S.F. 135 $11.00 $1,485.00 $10.00 $1,350.00 $9.00 $1,215.00 13.50$ 1,822.50$ 712-07.03 TEMPORARY BARRICADES (TYPE III) L.F. 12 $20.00 $240.00 $24.00 $288.00 $23.00 $276.00 38.00$ 456.00$ 713-02.21 SIGN POST DELINEATION ENHANCEMENT L.F. 40 $6.00 $240.00 $24.00 $960.00 $4.50 $180.00 8.00$ 320.00$ 713-11.01 "U" SECTION STEEL POSTS LB. 117 $6.00 $702.00 $6.00 $702.00 $5.00 $585.00 8.45$ 988.65$ VIEW STREET ROADWAY QUANTITIES NORTH JACKSON ROADWAY QUANTITIES View Street Roadway Improvements & North Jackson Street Repairs DescriptionItem Adams Contract, LLC Unit Quantity Engineer Cadence Consulting, LLCWilson Constr Group, LLC 1 16