4 No. Program/Cost/Funding Source Responsible Party Status Public Works Department (continued) 41 Conduct grand opening ceremony for the animal shelter during June 2025. Public Works Director / Project Manager Working with MRHS toward having the grand opening event on the one year anniversary of opening the facility in June 2025. 42 Improve downtown five points intersection including sidewalks, pedestrian crossings, retiming of traffic signals for pedestrian safety, $750,000 using TDOT MMAG grant (90% state/10% local). Public Works Director / Project Manager A RFQ was prepared for engineering services, 5 responses received, 3 were asked for full proposals. Recommended firm on Feb. 10, 2025 work session for consideration. Then design and construction. Construction is expected to begin in 2026 and be completed in 2027. 43 Prepare a traffic safety action plan to identify problematic and unsafe traffic areas, $105,000 using a federal Safe Streets for All (SS4A) Grant (80%, grant/20% local). Public Works Director / Project Manager Kimly Horn has collected data, draft report has been prepared and being reviewed. Completed plan scheduled to be on March 10, 2025 work session for consideration. Once plan is completed/adopted, grant applications can be prepared/submitted for construction of priorities. 44 Resurface 9 city streets totaling 3.94 miles, $1,370,000 using Surface Transportation Block Grant Local (STBG-L) funds. • Mt. Verd Rd. from Clearwater Rd to city limits (.34) • Sharp Rd. from Velma Rd. to Railroad Ave (.21) • Tellico Ave. from Congress to Astrid St (.83) • Dennis St. from Congress to Decatur Pike (.62) • Woodward Ave. from N. Jackson St. to Ingleside Ave (1.07) • Forrest Ave. from Ingleside Ave. to Madison Ave (.29) • Guille St. from Ingleside Ave. to Eastanallee Ave (.12) • Glendale Ave. from Park St. to Cedar Springs Rd (.29) Cedar Springs Rd. from Glendale Ave. to Elizabeth St (.17). Public Works Director / Project Manager City Council approved the 9 list of streets during April 2022, Gresham Smith Engineers completed final design and submitted to TDOT for approval. Once approved, projects will be bid out during March 2025, bid considered by council during April 2025, and completion during late 2025/early 2026. 45 Prepare next round of local street paving set for 2026, $2,000,000 using local funds. Public Works Director 46 Prepare an electronic inventory/data base of major city storm water assets of location, size, and condition to determine stormwater needs. Then design and construct needed improvements, $2,371,903 using ARPA grant funds (85% grant/15% local). This study is a precursor to creating a storm water utility. Public Works Director / Project Manager Gresham Smith Engineers has collected all data. System modeling underway, Plan expected to be completed mid-2025. Then design, bid, award, and construct projects. Must be completed by Sept. 2026. 47 Update MS4 stormwater ordinance/permit for compliance. Public Works Director Updating ordinance. Expected completion during early 2025. 74