2025 1 21 Regular Session Packet 1
City Council · packet · 92 pages · Descriptive metadata inferred from filename
Extracted text for page 38
Unverified text extraction. Check the original page for numbers, names, and layout.
Estimated One-Time Construction Cost and Estimated Annual Operational Cost for Fire Station #3 One-Time Construction Cost Items Estimated Cost Architect Design Fees Including Programming, Civil, and Construction Administration for a 9,000 S.F Fire Station with Two Drive-Through Bays and Heavy Duty Concrete Driveways and Bays $340,000 Site Preparation Cost for 2.47 Acres 250,000 Construction Cost @ 450 per S.F. 4,050,000 Furniture/Fixtures/Equipment (FFE) 100,000 Generator 100,000 Soils Report 10,000 Topo Survey 6,000 Fire Marshall Review Fee 8,000 10% Contingency 405,000 Total Estimated One-Time Construction Costs $5,269,000 Source: Allen Hoshall, Architects and City Staff Annual Operational Cost Items Estimated Costs 9 Fire Fighters Salary and Benefits $652,000 Physicals 5,000 Utilities 11,000 Telephone 2,000 Repairs/Maintenance 10,000 Uniforms/Gear 40,000 Property & Liability Insurance 10,000 Supplies 5,000 Lawn Care 5,000 Gasoline/Diesel 7,500 Vehicle Maintenance 5,000 Tires 2,500 Fleet Replacement Cost 50,000 Total Estimated Annual Operational Costs $805,000 Source: City Staff Note: these costs do not include additional fire trucks. 28