2025 7 7 Work Session Packet website 1
City Council · packet · 81 pages · Descriptive metadata inferred from filename
Extracted text for page 75
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item III. O. 2. i. Councilmember Sherlin: Hammerhill Road Sidewalk Overview The Hammerhill Road Sidewalk Project proposes the construction of approximately 2,200 linear feet of new sidewalk along Tellico Avenue, extending to Towanda Trail. The conceptual design includes a 5-foot-wide sidewalk without a grass buffer, with driveway crossings assumed at 12 feet wide (for 16 total driveways). The project is scoped for concrete sidewalk installation with curb ramps, driveway tie-ins, earthwork and drainage, and erosion prevention/sediment control measures. The total probable construction cost is estimated at $370,722, based on TDOT 2024 average unit pricing and includes a 20% contingency. However, it is critical to note that this estimate excludes costs for surveys, right -of-way (ROW) acquisition, engineering design, or utility relocation. When accounting for these omitted services and unknowns, the total estimated project cost is projected closer to $500,000 The project area falls within the City’s 2023 Athens Bike & Pedestrian Master Plan, which identifies it as part of a broader network of pedestrian improvement priorities. A project map is included (page 4 of the document), showing the proposed sidewalk ali gnment through a residential area with several intersecting neighborhood streets. At this time, the project has not been funded or scheduled, and there is no allocation for this work in the FY 2025– 26 budget. Future phases would require funding for design, ROW coordination, and construction oversight. Action to Consider Consensus is required to move this item to the July 15, 2025 regular session for consideration. Affected Departments Public Works 73