PUBLIC WORKS TO: Randall Dowling, City Manager FROM: Kevin L. Helms, Project Manager Cc: Ben Burchfield, Public Works Director DATE: July 2, 2025 SUBJECT: ARP Stormwater Grant – Property Purchase Background In July 2023 the city executed a grant contract with the Tennessee Department of Environment and Conservation for funding relat ed to stormwater projects. The city will receive $ 2,371,902.77 in grant funds and will be required to match these funds with $355,785.42 for a total project budget of $2,727,688.19. Of this amount, $1,980,000 is for construction activit ies and $747,688.19 is for professional fees related to planning activities. The project has been progressing t hrough several stages of development. The most time -consuming component was the survey of all stormwater assets within the city system sized 24 ” or greater. The location, material, condition, and elevation of each asset were documented and will be imported into a software program so that we have an accurate inventory of assets. Once the survey was complete the data was utilized to perform hydraulic modeling of the system to identify solutions for problem areas which would be constructed using grant funds. Several factors contributed t o the locations to be addressed with this funding. The first priority was to determine whether a project could be constructed prior to the grant deadline of September 2026. After that criterion had been established, other factors such as cost and severity were analyzed to determine the final list of construction activities. The single largest project selected for construction is the addition of new stormwater assets near the Wetlands Trail and Ingleside Park. This facility would serve a similar purpose to the wetlands that were constructed several years ago, but the design and function would be slightly different. Instead of an area that stays wet year-round, the new facility would be a dry storage area where a large park like greenspace will exist during the dry season. The area would be nicely landscaped with native plants and potentially include a walking trail with s tormwater education exhibits, along with an overlook at the corner of Ingleside Avenue and Forrest Avenue. Connections would be available to the existing wetlands, E. G. Fisher Library, Ingleside Park, and the Mayfield Visitor Center. 5