Agenda Item III. B. Purchase of Needed Property for the ARP Funded Stormwater Project and Approval of Resolution No. 2025-17 Overview The City received a stormwater grant from the Tennessee Department of Environment & Conservation during 2023 to prepare an electronic inventory/data base of major city stormwater assets including information about asset location, material, size, elevation, and condition to determine overall stormwater needs. Based on the collected information, the city will construct a project that is needed to improve the city’s stormwater capabilities, water quality, and minimize streambank erosion. The project that was selected was to purchase 5.12 acres of land at the intersection of Ingleside Avenue and Forrest Avenue across from Ingleside Park to shape into a new city-controlled stormwater asset to manage stormwater from the Oostanaula Creek. Since this property will be a dry storage area some of the time, it will be transformed into a parklike green space with native plants, walking trail, stormwater education exhibits, and perhaps tie - ins/connections with nearby Mayfield Dairy Visitor Center (concept plan is attached). The 5.12 acres is entirely within the flood zone and largely within the floodway making it severely limited to development. The purchase price is $135,000 based on a recent appraisal. Funds for this purchase as well as the entire project were budgeted in t he approved FY 2025- 26 Capital Improvement Fund budget. Attached is a memo from the Public Works Department that offers more details and how the property would be purchased through the Economic Development Authority to maximize grant funding. Action to Consider Consensus is needed to move this item to the July 15, 2025 regular session for consideration. Affected Departments Public Works Dept. 4