Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 7 7 Work Session Packet website 1

City Council · packet · 81 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 29

Unverified text extraction. Check the original page for numbers, names, and layout.

 
 
 
 
 
 
 
Agenda Item  
III. G.  Proposal from Kimley Horn to Build Upon the Previously Prepared Downtown Master 
Plan by Preparing Schematic Designs, Developing a Pattern Book, and Refining 
Priorities/Phases.  
 
Overview 
A downtown master plan was prepared during 2020 showing high level concepts of street/parking 
and sidewalk/pedestrian improvements, traffic calming measures, landscaping/streetscaping, way 
finding signage designs, among other design elements for the downtown area. To build upon that 
master plan from concept to actual, Kimley Horn has prepared a proposal (attached) to: 
 
• prepare schematic designs within the study area to show street widths, sidewalk widths, 
parking, pavement markings, and landscape areas including street tree locations/standards. 
 
• develop a pattern book showing standard designs, graphic examples, and manufacture rs 
of sidewalk materials/brick patterns, street light poles, traffic signal arms, street signage, 
wayfinding signage, trash receptacles, benches, bike racks, pedestrian signals, and trees to 
maintain consistency throughout the downtown area. The pattern book would also have a 
typical on-street dining layout and landscape treatments for intersection corners. 
 
• prepare a phasing plan and map to align the various phases with anticipated funding.  
 
This project was included in the approved FY 2025- 26 Capital Improvement Fund budget at 
$50,000. If approved, the project would be completed in about four months or during November, 
2025. During development of the schematic designs, pattern book, and phasing plan, we will obtain 
comments and feedback from numerous stakeholders such as city officials, city department heads, 
county officials, Main Street, TWU, Chamber of Commerce, downtown business owners, among 
other interested parties to ensure this project receives vital input.  
 
Action to Consider 
Consensus is needed to move this item to the July 15, 2025 regular session for consideration.  
 
Affected Departments 
Parks & Recreation Department and Public Works Department 
 
 
 
 
27