Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 7 7 Work Session Packet website 1

City Council · packet · 81 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 25

Unverified text extraction. Check the original page for numbers, names, and layout.

Terms of Service
1) Assumes fence removal and replacement by City of Athens staff
2) Assumes a continuous, uninterrupted workflow and haul routes for project duration
3) Assumes adequate staging and laydown areas for project duration
4) Assumes excavated materials will be dumped on site
5) Does not allow for removal, remediation or replacement of unsuitable soils, solid rock or hazardous materials
6) Does not allow for the removal, remediation, or replacement of underground utilities. Utility location by owner
7) Does not allow for repair or replacement of parking lots, sidewalks or landscape areas damaged during construction
8) Engineering, design and permitting by others
9) Performance & payment bonds available for a 1% surcharge
10) Based on current material and labor prices and is subject to change after 30 days due to current market volatility
11) Assumes construction late summer / fall of 2025
12) Cooperative purchasing agreement is available via SHAW Sports Turf OMNIA contract # R050422 for sports surfaces
Signature
City
of Athens, TN
Athens Regional Park - City of Athens, TN
Page 2 of 2
23