PUBLIC WORKS We are requesting the balance of appropriated funds in the amount of $78,756.62 be approved as contingency for the project. This represents 5/5% of the total project cost, which is well within the general percentage of construction allocated for project contingency. The proposal from Baseline is attached. Product Information and Installation Process The project will be completed in two phases. The initial phase will begin as soon as possible and will address the drainage issues in the outfield of field four. The ideal scenario is for this work to be done while grass is still actively growing so dist urbed areas will be covered by grass before it goes dormant for the winter. The remainder of the project will begin about the fourth week of October, which is immediately after the end of the current softball season. Construction should be completed by the end of February so that the March league can begin play as normally scheduled. The turf to be utilized on the fields is TRUHOP 46 which is manufactured in Georgia by S HAW Sports Turf. The color will be very similar to the color of the infield clay mix currently in use on all fields. This specific product has been used at numerous facilities nationwide including: • Dunedin Park (Toronto Blue Jays Spring Training Facility) – Dunedin, Florida • Bear River Sports Complex – Loleta, Georgia • Cedar Stone Park – Smyrna, Tennessee • Riverdale High School – Murfreesboro, Tennessee A product specification sheet is attached. Action Needed Motion to approve awarding the Regional Park Turf Installation Project to Baseline using SHAW Sports Turf OMNIA Cooperative Purchasing Contract #R050422 in an amount not to exceed $1,500,000. 21