Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 7 7 Work Session Packet website 1

City Council · packet · 81 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 19

Machine-read OCR text; verify every number, name, and layout against the original page.

Gresham
“N Smith June 13, 2025

Page 2 of 2
Project Management $2,540.00

The tasks for project management.

1. Project invoicing.
2. Coordination with City project manager.

ASSUMPTIONS

1. City of Athens to provide Survey data.
2. Disturbed area should be less than 1 acre. Assuming no permits.
3. Design will follow TDOT and City of Athens standards and specifications.

SERVICES NOT INCLUDED IN THE SCOPE OF WORK

The following items are not anticipated to be required at this time and are therefore specifically excluded
from the scope. These services may be added at the CLIENT’S request as extra service.

Survey

Preliminary and ROW Plan set.

ROW acquisitions, negotiations, and appraisals.
SWPPP, ARAP and/or ACOE permits.
Signal design.

NEPA Document.

Hydrologic Determination.
Geotechnical services.

. Utility relocation plans.

10. Railroad Coordination

11. Topographic survey

12. RLS boundary survey

13. Utility Coordination

OHONAARWN>

DELIVERABLES

Gresham Smith will provide the respective project submittal documents as detailed below in electronic
format via the Newforma File Management System.

Construction plans and bidding documents.

Additional required services outside the limits of the scope detailed above may be supplemented later.

Based on the above-mentioned items the engineer will be billing a lump sum amount of $28,447.50 the

scope and fee for any additional services will be agreed upon in writing by both the Engineer and the
Owner before beginning work.

Genuine Ingenuity

2095 Lakeside Centre Way / Suite 210 / Knoxville, TN 37922 / 865-521-6777 / GreshamSmith.com

17