Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 7 7 Work Session Packet website 1

City Council · packet · 81 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 15

Unverified text extraction. Check the original page for numbers, names, and layout.

 
 
 
 
 
 
 
Agenda Item  
III. D. Proposal from Gresham Smith Engineers to Design and Prepare Construction Drawings to 
Connect View Street.  
 
Overview 
The city recently acquired a 0.13-acre strip of land as right-of-way to connect the two sides of 
View Street in preparation of connecting and paving this city street as a through street . The 
approved FY 2025- 26 Capital Improvement Fund budget contains $305,000 to design, prepare 
construction drawings, bid out, and construct this project. Gresham Smith Engineers has submitted 
a proposal for this project (attached). After the construction drawings are completed, they will be 
bid out, the bid awarded by City Council, and construction will begin. Estimated completion time 
is Spring 2026.  
 
A memo from the Public Works Department with additional details is also attached.  
 
Action to Consider 
Consensus is needed to move this item to the July 15, 2025 regular session for consideration.  
 
Affected Departments 
Public Works  
 
 
13