Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 3 18 Packet 2

City Council · packet · 143 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 27

Unverified text extraction. Check the original page for numbers, names, and layout.

 
 
Agenda Item 
VIII C.          Approve contract and quote of $127,800 from Kimley Horn and Associates, Inc. for  
RFQ 24-08 for Preliminary Design, Environmental Clearances, and Data  
Collection for Historic Downtown Street Improvements at Five Intersections on  
Green Street 
 
Overview 
During July 2023, the city applied for a $750,184 Multi -Modal Access Grant from TDOT to 
improve five intersections along Green Street, namely the intersections of Forrest Avenue, Atlantic 
Street, Ingleside Avenue, Eastanallee Avenue, and Sunset Drive. The improvements will include 
sidewalks, bike lanes, pedestrian crossing signals, retime traffic signals, ADA compliance, and 
stormwater facilities. This project was identified in the Traffic Safety Action Plan (2025) prepared 
by Kimley Horn Engineers and the Bike & Pedestrian Master Plan (2023). The city was notified 
during early 2025 that the grant was awarded with the state share being 90% ($675,166) and the 
city share being 10% ($75,018). After conducting an RFQ process, Kimley Horn Engineers is 
recommended to the City Council by the staff review committee to perform this street 
improvement project. Their scope of work for this phase includes preliminary design, 
environmental clearances, survey data, and utility data for a fee of $127,800. Phase II, which will 
be budgeted and occur during FY 2025- 26, will consist of preparing construction documents, 
bidding, and actual construction. 
 
A memo from the Public Works Department and Kimley Horn’s proposal are attached. 
Following discussion during the March 10, 2025 work session, the consensus was to place this 
item on the March 18, 2025 regular session consent agenda for approval. 
Action to Consider 
Motion, second, and vote are needed to approve the proposal with Kimley Horn Engineers for 
them to conduct preliminary design, environmental clearances, and collect survey data and utility 
data for a fee of $127,800 for five intersections on Green Street. 
 
Affected Departments 
Public Wo rks  
22