2024 04 16 City Council Packet 62pages 1
City Council · packet · 64 pages · Descriptive metadata inferred from filename
Extracted text for page 9
Unverified text extraction. Check the original page for numbers, names, and layout.
COST TRACKING FOR ATHENS PREK-5 SCHOOL October 19, 2023 revised per CO #07 2024-02-18 CONTRACT SUM ALLOWANCES CONTINGENCY NOTES ORIGINAL CONTRACT AMOUNTS $27,365,000.00 $1,407,350.00 $750,000.00 add 3-5 classroom wing & window extensions $8,974,714.71 CHANGE ORDER 01 SUBTOTAL $8,974,714.71 $0.00 $0.00 RUNNING CONTRACT SUM TOTAL $36,339,714.71 $1,407,350.00 $750,000.00 4 bldg pad unsuitable soils $312,265.40 13 february 2021 delay days $0.00 4 days 14 SFMO changes $8,551.68 15 march 2021 delay days $0.00 4 days 16 gym floor graphics $627.00 17 added canopy scope $167,483.80 22 may 2021 delay days $0.00 1 day 23 food services floor sink add $3,014.84 25 asphalt index adjustment $1,313.99 26 replace storm structure #47 $5,522.10 27 june 2021 delay days $0.00 5 days 28 MS asphalt paving - phase I $143,000.00 29 keith lane box culvert mud matte $6,197.65 32 bldg undercut delay days $0.00 24 days 33 MS striping & signage $8,525.00 34 added water shut off valves $4,982.92 36 ext basketball court fencing $2,307.80 37 july 2021 delay days $0.00 5 days 43 coiling door electrical $1,392.85 44 september 2021 delay days $0.00 6 days 57 august 2021 delay days $0.00 4 days - transfer remaining allowance 01-09 $32,786.22 ($32,786.22) should have been $32,784.60 CHANGE ORDER 02 SUBTOTAL $0.00 $345,051.62 $320,133.41 RUNNING CONTRACT SUM TOTAL $36,339,714.71 $1,062,298.38 $429,866.59 30 keith lane initial drop out repairs $23,839.02 39 keith lane drop out cap grouting $54,464.77 removed P&P bond 61 remove motorized window shades ($10,602.00) 63 october 2021 delay days $0.00 7 days 64 added hot box per AUB $25,026.97 removed P&P bond 66 december 2021 delay days $0.00 3 days 67 reduce corridor sound baffles ($4,200.00) 72 change electrical door swing $1,300.52 75 added hose bib $975.28 76 january 2022 delay days $0.00 4 days 79 dining projection screens $2,715.96 80 added roof drains $17,158.96 removed P&P bond 82 bipolar ionization filter change $4,609.00 removed P&P bond 86 playground & IT allowance removal ($1,060,000.00) $1,060,000.00 92 march 2022 delay days 2 days CHANGE ORDER 03 SUBTOTAL ($1,060,000.00) $1,060,000.00 $115,288.48 RUNNING CONTRACT SUM TOTAL $35,279,714.71 $2,298.38 $314,578.11 68 custom yellow metal panels $17,886.00 78 egress stair rated gypsum board $3,972.10 81 reception area wall support $4,303.43 89 parapet backside insulation ($23,349.06) 90 underground power for digital signage $18,452.50 98 loading dock trash can drain $2,513.35 99 outdoor basketball goal change $5,964.30 105 dining egress lighting & access controls $4,979.70 106 main entry & courtyard soffit framing $15,831.20 CHANGE ORDER 01 CHANGE ORDER 04 CHANGE ORDER 03 CHANGE ORDER 02 7