COST TRACKING FOR ATHENS PREK-5 SCHOOL October 19, 2023 revised per CO #07 2024-02-18 CONTRACT SUM ALLOWANCES CONTINGENCY NOTES OWNER CONTINGENCY $575,741.93 as of Change Order 07 REMAINING CONTINGENCY GRAND TOTAL $603,592.42 DROPOUT REPAIRS $100,000.00 NORTH SITE EXCAVATION / UNSUITABLE SOILS $0.00 none ASPHALT INDEX $75,000.00 refer also to PCO 104 PLAYGROUND REGRADING $0.00 already priced, approved, included POWERS PATH $0.00 already priced, approved, included CITY REGRADING FOR SIDEWALKS $0.00 already priced, approved, included UNKNOWN BUILDING PCOs $100,000.00 MISCELLANEOUS $100,000.00 "HOLDOUT" CONTINGENCY SUBTOTAL $375,000.00 AVAILABLE OVERALL CONTINGENCY $228,592.42 172 caulking sides of window extensions $20,000.00 179 canopy flashing STEM acoustical panels credit for artificial turf concrete curb ($8,175.00) keep in turf credit remaining asphalt index adjustment $15,000.00 rough estimate radio repeater system upgrades (800mH) credit for construction utilities ($16,701.24) zoysia grass at athletic fields sent sketch to merit 11/13 OUTSTANDING PCO SUBTOTAL $10,123.76 $0.00 $0.00 REMAINING CONTRACTOR CONTINGENCY $27,850.49 REMAINING OVERALL CONTINGENCY $228,592.42 "HOLDOUT" CONTINGENCIES OUTSTANDING PCOs (MINUS REDESIGN CHANGES) 10