2024 04 16 City Council Packet 62pages 1
City Council · packet · 64 pages · Descriptive metadata inferred from filename
Extracted text for page 10
Unverified text extraction. Check the original page for numbers, names, and layout.
COST TRACKING FOR ATHENS PREK-5 SCHOOL October 19, 2023 revised per CO #07 2024-02-18 CONTRACT SUM ALLOWANCES CONTINGENCY NOTES 135 area G window conflict $9,055.20 CHANGE ORDER 04 SUBTOTAL $0.00 $0.00 $59,608.72 RUNNING CONTRACT SUM TOTAL $35,279,714.71 $2,298.38 $254,969.39 60 removing classroom window lighting ($8,000.00) 69 main roof scuppers $12,408.00 107 MS sidewalk & stair $107,797.50 113 soccer fencing changes $4,946.70 114 playground fencing $1,685.20 115 softball concrete sidewalk (red) $69,959.67 116 pressbox concrete sidewalk (yellow) $14,387.45 117 soccer concrete sidewalk (green) $27,663.90 118 concessions concrete sidewalk (blue) $14,443.00 119 fire rated wall above CMU at joist $1,609.30 120 fire rated ceiling removal at vaults ($1,648.00) 122 city scope reductions $18,260.16 123 preK playground grading & storm $6,492.64 124 courtyard playground grading & storm $8,639.77 126 dugout water hydrant $1,463.00 129 athletic stormwater $311,968.45 130 athletic regrading $421,106.66 132 athletic site electrical changes ($1,008.89) 133 athletic additional site lighting (red pole) $8,646.01 136a caulking top of window extensions $5,500.00 146a additional parking (blue) $99,825.97 146b additional parking (red) $180,081.85 147 media center additional sprinkler heads $7,478.42 150 bathroom window film $962.50 CHANGE ORDER 05 SUBTOTAL $1,265,494.61 $0.00 $49,174.65 RUNNING CONTRACT SUM TOTAL $36,545,209.32 $2,298.38 $205,794.74 110 stair doors F218 & G223 $10,672.20 sent to ACS 05/23/23 111 door schedule E201 $5,336.10 sent to ACS 05/23/23 127 concessions sanitary sewer $58,630.97 134 infield mix - softball to baseball & bullpen ($71,129.55) 134 infield mix - softball field credit ($56,129.50) 134 soccer field sod credit ($31,659.60) 134 outfield sod credit ($23,152.92) 134 soccer field french drain credit ($29,011.17) 134 infield french drain credit ($15,281.42) 134 outfield french drain credit ($21,619.11) 148 replace music & STEM sinks $3,347.22 149 refrigerant line walls $811.32 152 gym fire resistive glazing $2,981.00 increase of $1,692.24 153 transaction windows $330.00 154 light pole bases at storm structures $3,788.28 155 spray wash GFI breaker $1,012.65 157 city scope concrete & striping credit ($7,230.00) 159 concessions stand $507,343.44 160 media center storefront window / metal $2,915.00 165 pressbox $185,874.92 increase of $1,497.63 166 credit for CCC basin water treatment ($5,300.00) - transfer remaining allowance 10-11 $2,298.38 ($2,312.17) CHANGE ORDER 06 SUBTOTAL $445,235.09 $2,312.17 $74,982.57 RUNNING CONTRACT SUM TOTAL $36,990,444.41 ($13.79) $130,812.17 141 september 2022 delay days $0.00 2 days 151 january 2023 delay days $0.00 2 days CHANGE ORDER 05 CHANGE ORDER 07 CHANGE ORDER 06 8