2026 4 13 Work Session PACKET website
City Council · packet · 66 pages · Descriptive metadata inferred from filename
View PDF on the City website · page 25
The PDF opens on the City of Athens website in a new tab. Use PDF page 25 to check the cited record.
Extracted text for page 25
Unverified text extraction. Check the original page for numbers, names, and layout.
Task Order No. 2 , Revision 1 9 • Surveying services • Environmental services, including jurisdictional waters/ wetlands identification and delineation 3 Compensation Engineer will complete the Scope of Services described herein for compensation calculated on a “time and materials” basis up to a maximum not - to - exceed fee of $ 144,300 .00 . A compensation schedule with hourly rates for Engineer’s personnel by classification is included herewith as Attachment A - 1. In the event Owner requests additional services beyond those included in this document, Engineer will provide a written proposal and amendment request. Engineer will proceed with additional services only after receipt of written authorization from Owner . The compensation amount shown above includes Gresham Smith and subconsultants. Table 3 - 1 shows the contract value for each project phase. Table 3 - 1 : Compensation Summary Project Phase Compensation Project Management, Meetings, and Coordination $ 14 ,000 100 % Design Submittal $ 45 ,000 Bid Phase Services $ 20 , 000 Construction Phase Services $ 59 , 000 Estimated Reimbursable Expenses $ 6,3 00 TOTAL $ 144,300 23