2026 4 13 Work Session PACKET website
City Council · packet · 66 pages · Descriptive metadata inferred from filename
Extracted text for page 25
Unverified text extraction. Check the original page for numbers, names, and layout.
Task Order No. 2 , Revision 1 9 • Surveying services • Environmental services, including jurisdictional waters/ wetlands identification and delineation 3 Compensation Engineer will complete the Scope of Services described herein for compensation calculated on a “time and materials” basis up to a maximum not - to - exceed fee of $ 144,300 .00 . A compensation schedule with hourly rates for Engineer’s personnel by classification is included herewith as Attachment A - 1. In the event Owner requests additional services beyond those included in this document, Engineer will provide a written proposal and amendment request. Engineer will proceed with additional services only after receipt of written authorization from Owner . The compensation amount shown above includes Gresham Smith and subconsultants. Table 3 - 1 shows the contract value for each project phase. Table 3 - 1 : Compensation Summary Project Phase Compensation Project Management, Meetings, and Coordination $ 14 ,000 100 % Design Submittal $ 45 ,000 Bid Phase Services $ 20 , 000 Construction Phase Services $ 59 , 000 Estimated Reimbursable Expenses $ 6,3 00 TOTAL $ 144,300 23