Athens TransparencyPublic records. Clearer understanding.Independent civic research

Source library

2026 4 13 Work Session PACKET website

City Council · packet · 66 pages · Descriptive metadata inferred from filename

View PDF on the City website · page 25

The PDF opens on the City of Athens website in a new tab. Use PDF page 25 to check the cited record.

Extracted text for page 25

Unverified text extraction. Check the original page for numbers, names, and layout.

Task Order No. 
 2
, Revision 1  
 
9  
 
• 
 Surveying services  
• 
 Environmental services, including 
 jurisdictional waters/
 wetlands 
 identification and  
delineation  
3 
 Compensation  
 
Engineer will complete the Scope of Services described herein 
 for compensation calculated on a 
“time and materials” basis up to a maximum not
 -
to
-
exceed 
 fee  
of $
 144,300
 .00
 .  
A compensation schedule with hourly rates for Engineer’s personnel by classification is included 
herewith as Attachment A
 -
1. In the event 
 Owner  
requests additional services beyond those 
included in this document, Engineer will provide a written proposal and amendment request. 
Engineer will proceed with additional services only after receipt of written authorization from 
Owner
 . 
The compensation 
 amount 
 shown above includes Gresham Smith and subconsultants. 
 Table 
 3
 -
1 
shows the contract value for each 
 project phase.   
Table 
 3
-
1
: Compensation Summary  
Project Phase  
 Compensation  
Project Management, Meetings, and Coordination  
 $
 14
,000  
100
 % Design Submittal  
 $
 45
 ,000  
Bid Phase Services  
 $
 20
 ,
000  
Construction Phase Services  
 $
 59
 ,
000  
Estimated Reimbursable Expenses  
 $
 6,3
 00  
TOTAL  
 $
 144,300  
 
  
23