Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2026 4 13 Work Session PACKET website

City Council · packet · 66 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 25

Unverified text extraction. Check the original page for numbers, names, and layout.

Task Order No. 
 2
, Revision 1  
 
9  
 
• 
 Surveying services  
• 
 Environmental services, including 
 jurisdictional waters/
 wetlands 
 identification and  
delineation  
3 
 Compensation  
 
Engineer will complete the Scope of Services described herein 
 for compensation calculated on a 
“time and materials” basis up to a maximum not
 -
to
-
exceed 
 fee  
of $
 144,300
 .00
 .  
A compensation schedule with hourly rates for Engineer’s personnel by classification is included 
herewith as Attachment A
 -
1. In the event 
 Owner  
requests additional services beyond those 
included in this document, Engineer will provide a written proposal and amendment request. 
Engineer will proceed with additional services only after receipt of written authorization from 
Owner
 . 
The compensation 
 amount 
 shown above includes Gresham Smith and subconsultants. 
 Table 
 3
 -
1 
shows the contract value for each 
 project phase.   
Table 
 3
-
1
: Compensation Summary  
Project Phase  
 Compensation  
Project Management, Meetings, and Coordination  
 $
 14
,000  
100
 % Design Submittal  
 $
 45
 ,000  
Bid Phase Services  
 $
 20
 ,
000  
Construction Phase Services  
 $
 59
 ,
000  
Estimated Reimbursable Expenses  
 $
 6,3
 00  
TOTAL  
 $
 144,300  
 
  
23