Task Order No. 2 , Revision 1 8 Engineer's judgment as a design professional familiar with the construction industry. Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. • O wner will provide Division 01 and other “front - end” technical specifications for incorporation by Engineer into the Bid Documents . 2.7 Additional Services The following items are not included in the Scope of Services but can be provided if needed and requested by Owner . No Additional Services will be performed unless approved in writing by Owner . • Hydrologic and hydraulic modeling • US Army Corps of Engineers Permit application • City of Athens Permit(s) • Additional gravity stormwater evaluation and/or design services beyond what is specified herein. • Changes to the project layout after the 60% Submittal. • Additional permitting beyond what is specified herein. • Geotechnical services. • Additional survey outside original scope . • More than nine site visits during the Construction Phase. • Providing construction surveys and staking to enable Contractor to perform its work, and any type of property surveys or related engineering services needed for the transfer of interests in real property; and providing other special field surveys. • Providing assistance in responding to the presence of any “ Constituent of Concern ” at the Site, in compliance with current Laws and Regulations. • Preparing to serve or serving as a consultant or witness for Owner in any litigation, arbitration, or other dispute resolution process related to the Project. • Services in connection with work change directives and change orders to reflect changes requested by Owner. • Additional or extended services during construction made necessary by (i) emergencies or acts of God endangering the Work (advance notice not required), (ii) the presence at the Site of any Constituent of Concern or items of historical or cultural signific ance, (iii) Work damaged by fire or other cause during construction, (iv) a significant amount of defective, neglected, or delayed work by Contractor, (v) acceleration of the progress schedule involving services beyond normal working hours, or (vi) default by Contractor. • Reviewing a Shop Drawing more than three times, as a result of repeated inadequate submissions by Contractor. • Providing the services of a Resident Project Representative to observe and document the work of the Contractor. • Preparing a “Final Notice of Acceptability of the Work” or other construction contract close - out documentation. • Preparing or assisting Owner in preparing O&M manuals . • Post - construction phase services, including warranty period site visits and providing opinions regarding acceptability of work or corrections needed. • Other services performed or furnished by Engineer not otherwise provided for in this Agreement. • Permitting beyond that which is listed in Section 2.3 . 22