Task Order No. 
 2
, Revision 1  
 
8  
 
Engineer's judgment as a design professional familiar with the construction industry. 
Engineer cannot and does not guarantee that proposals, bids, or actual construction 
costs will not vary from its opinions of probable costs.  
• 
 O
 wner 
 will provide Division 01 and other “front
 -
end” technical specifications  
for 
incorporation by Engineer into the Bid Documents
 . 
2.7 
 Additional Services  
The 
 following items are not included in the Scope of Services but can be provided if needed  
and 
requested by Owner
 . No Additional Services will be performed unless approved in writing by 
Owner
 . 
• 
 Hydrologic and hydraulic modeling  
• 
 US Army Corps of Engineers Permit  
application  
• 
 City of Athens Permit(s)  
• 
 Additional gravity stormwater 
 evaluation and/or design 
 services 
 beyond 
 what is 
specified herein.  
• 
 Changes  
to the 
 project layout after the 60%  
Submittal.  
• 
 Additional permitting beyond what is specified herein.  
• 
 Geotechnical services.  
• 
 Additional survey outside original scope
 . 
• 
 More than 
 nine 
 site visits during the Construction Phase.   
• 
 Providing construction surveys and staking to enable Contractor to perform its work, 
and any type of property surveys or related engineering services needed for the transfer  
of interests in real property; and providing other special field surveys.  
• 
 Providing assistance in responding to the presence of any 
 “
Constituent of Concern
 ” 
at 
the Site, in compliance with current Laws and Regulations.  
• 
 Preparing to serve or serving as a consultant or witness for Owner in any litigation, 
arbitration, or other dispute resolution process related to the Project.  
• 
 Services in connection with work change directives and change orders to reflect 
changes requested by Owner.   
• 
 Additional or extended services during construction made necessary by (i) emergencies 
or acts of God endangering the Work (advance notice not required), (ii) the presence at 
the Site of any Constituent of Concern or items of historical or cultural signific
 ance, (iii) 
Work damaged by fire or other cause during construction, (iv) a significant amount of 
defective, neglected, or delayed work by Contractor, (v) acceleration of the progress 
schedule involving services beyond normal working hours, or (vi) default  
by Contractor.  
• 
 Reviewing a Shop Drawing more than three times, as a result of repeated inadequate 
submissions by Contractor.  
• 
 Providing the services of a Resident Project Representative to observe and document 
the work of the Contractor.   
• 
 Preparing a “Final Notice of Acceptability of the Work” or other construction contract 
close
 -
out documentation.  
• 
 Preparing or assisting Owner in preparing O&M manuals
 .  
• 
 Post
 -
construction phase services, including warranty period site visits and providing 
opinions regarding acceptability of work or corrections needed.   
• 
 Other services performed or furnished by Engineer not otherwise provided for in this 
Agreement.   
• 
 Permitting 
 beyond that which is 
 listed in Section  
2.3
 . 
22