Task Order No. 2 , Revision 1 5 2.4 Bid Phase Services During the bid phase of the project, Engineer will: a. Assist Owner with the development of bid advertisement and any other documents needed to publish bid advertisement. b. Attend Pre - Bid Meeting and r ecord questions asked during pre - bid meeting for inclusion in addenda. c. Respond to Bid phase questions from prospective Bidders and provide information to Owner as may be required to publish addenda as appropriate to clarify, correct, or change the Bidding Documents or to provide supplemental information. d. Assist with the creating of addenda as needed during the bid phase. Coordinate with O wner staff for addenda publication. e. Attend bid opening. If certified bid tab is required, compile bid tab information and provide a Recommendation to Award. 2.5 Construction Phase Services a. Commencement and Duration : The Construction Phase will commence with the execution of the Construction Contract for the Project or any part thereof and will terminate upon final payment to Contractor by Owner. b. Pre - Construction Conference : Engineer’s Project Manager and Project Engineer will participate in a Pre - Construction Conference prior to commencement of Work at the Site. c. Schedules : Engineer will receive, review, and determine the acceptability of any schedules that Contractor is required to submit to Engineer, including the Progress Schedule, Schedule of Submittals, and Schedule of Values. d. Visits to Site and Observation of Construction : In connection with observations of Contractor’s Work while it is in progress, Engineer will make visits to the Site approximately once a month to observe as an experienced and qualified design professional the progress of Contractor’s executed Work. It is anticipated there will be a total of nine (9) site visits. Such visits and observations by Engineer are not intended to be exhaustive or to extend to every aspect of Contractor’s Work in progress or to invol ve detailed inspections of Contractor’s Work in progress beyond the responsibilities specifically assigned to Engineer in this Agreement and the Contract Documents, but rather are to be limited to spot checking, selective sampling, and similar methods of g eneral observation of the Work based on Engineer’s exercise of professional judgment. Based on information obtained during such visits and observations, Engineer will determine in general if the Work is proceeding in accordance with the Contract Documents , and Engineer will keep Owner informed of the progress of the Work via telephone and/or email communication. The purpose of Engineer’s visits to the Site will be to enable Engineer to better carry out the duties and responsibilities assigned to and undertaken by Engineer during the Construction Phase, and, in addition, by the exercise of Engineer’s efforts as an experienced and qualified design professional, to provide for Owner a greater degree of confidence that the completed Work will conform in general to the Contract Documents and that Contractor has implemented and maintained the integrity of the design conc ept of the completed Project as a functioning whole as indicated in the Contract Documents. Engineer shall not, during such visits or as a result of such observations of Contractor’s Work in progress, supervise, direct, or have control over Contractor’s Wo rk, nor shall Engineer have authority over or 19