Task Order No. 
 2
, Revision 1  
 
4  
 
b. 
 Prepare an estimate of construction quantities and develop a
 n 
AACE Class 1 O
 pinion of 
P
 robable 
 C
 onstruction 
 C
 ost (OPCC)
 . 
c. 
 Provide electronic PDF format set of plans to 
 O
 wner 
 for internal coordination.  
d. 
 Submit ARAP 
 application and supporting documentation
 . 
e. 
 Submit CGP application and SWPPP.  
f. 
 Assumed City internal review duration of 
 two days 
 and one 
 round of correlated comments 
will be provided to the 
 Engineer
 .  
g. 
 Initial 100% Construction Drawings will be stamped “Not for Construction”. After review and 
approval by 
 OWNER
 , final submittal will be signed and sealed. Final Construction Drawing 
deliverable will be one signed and sealed full size set of drawings and electronic PDF of 
signed and sealed drawings.  
h. 
 Submit to TDEC for ARPA review and address comments.  
2.3.1.1 
 Deliverables  
• 
 100% design Construction Documents in electronic pdf format.  
• 
 Draft technical specifications in electronic pdf format.  
• 
 AACE Class 2 OPCC in electronic pdf format.  
• 
 ARAP application
 s  
and supporting documents in electronic pdf format  
(Regional Park site 
only)
 . 
• 
 CGP application and supporting documents (SWPPP) in electronic pdf format  
(Regional Park 
site only)
 . 
2.3.2  
 Cook Street Detention  
a. 
 Prepare final construction plans and other items as listed below:  
• 
 Cover Sheet  
• 
 General Notes Sheet(s)  
• 
 Existing Conditions 
 Plan  
• 
 Site Layout Plan  
• 
 Grading & Drainage Plan
 (s)  
• 
 Erosion Control Plan(s)  
• 
 Cut/Fill Sheet(s)  
• 
 Planting Plans(s)  
• 
 Low Flow Channel  
Stabilization Plan(s)  
• 
 Construction Details(s)  
 
b. 
 Prepare an estimate of construction quantities and develop 
 a AACE Class 1 OPCC
 . 
c. 
 Provide electronic PDF format set of plans to 
 Owner 
 for internal coordination.  
d. 
 Assumed City internal review duration of 
 two (2) days and one 
 round of correlated 
comments will be provided to the 
 Engineer
 .  
e. 
 Initial 100% Construction Drawings will be stamped “Not for Construction”. After review and 
approval by OWNER, final submittal will be signed and sealed. Final Construction Drawing 
deliverable will be one signed and sealed full size set of drawings and ele
 ctronic PDF of 
signed and sealed drawings.  
2.3.2.1  
 Deliverables  
• 
 100% design Construction Documents in electronic pdf format.  
• 
 Draft technical specifications in electronic pdf format.  
• 
 AACE Class 
 1 
OPCC in electronic pdf format.  
18