Task Order No. 2 , Revision 1 3 develop C G P application and supporting documentation and submit on behalf of Owner . The application fee will be paid by Engineer and reimbursed by Owner . • Preparing Record Drawings showing appropriate record information based on Project annotated record documents received from Contractor, and furnishing such Record Drawings to Owner. • Bid phase services as listed below. • Construction phase services as listed below. • Exclusions as listed in Section 2.7 below. 2.1.2 Cook Street Pond • Provide design services for stormwater infrastructure improvements on the Cook Street Pond site. The Project generally includes the removal and replacement of the outlet structure. The project site is shown in Exhibit A. • Preparing Record Drawings showing appropriate record information based on Project annotated record documents received from Contractor, and furnishing such Record Drawings to Owner. • Bid phase services as listed below. • Construction phase services as listed below. • Exclusions as listed in Section 2.7 below. 2.1.3 Mayfield Dairy • Provide, in accordance with agency requirements, stamped and sealed utility plans, specifications, and supporting documentation to TDEC Division of Water Resources (DWR) for review and approval. • Preparing Record Drawings showing appropriate record information based on Project annotated record documents received from Contractor, and furnishing such Record Drawings to Owner. 2.2 Project Management, Meetings, and Coordination a. Engineer will provide the services of a qualified Project Manager and support staff to manage the Project and team from notice to proceed (NTP) through close - out. Project management will include coordination between Engineer and Owner , as well as coordination between Engineer and its Subconsultants. b. Design review meetings will be held after each design submittal. Owner will review submittal documents and the design review meeting will be used to discuss review comments with Engineer. All meetings will be virtual. Anticipated meetings for this project include one 100% Design Review Meeting. 2.3 10 0% Design Submittal The plans will be prepared in conformance with applicable City of Athens Standards, Policies, and Criteria. Plans wi ll be prepared in a form suitable for advertise ment for construction bids. 2.3.1 Regional Park Dredging a. Prepare final construction plans and other items as listed below: • Cover Sheet • General Notes Sheet(s) • Existing Conditions Plan • Proposed Conditions Plan • Erosion Control Plan(s) • Construction Details(s) 17