Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2026 4 13 Work Session PACKET website

City Council · packet · 66 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 16

Unverified text extraction. Check the original page for numbers, names, and layout.

T
ask Order No. 
 1
, Revision 1  
 
2 
 
1 
 Change in Scop
 e of Services  
 
The 
 original survey 
 fee provided by Robert G. Campbell 
 and Associate
 s (
 “
Subconsultant
 ”
) 
was based on and estimated number of stormwater assets  
(manholes, inlets, pip
 es, etc.). 
Subconsultant located 
 a
nd surveyed additional stormwater assets 
 beyond  
the original 
estimated amount. 
 The amount 
 over the original es
 timates 
 are:  
 
• 
 Pipes greater than 24”
 - 
343 total 
 (143 over initial estimate)  
• 
 Bridges/Culverts
 - 
21 
(Bridge estimate accurate but no initial estimate on culverts)   
2 
 Compensation  
 
To cover the 
 cost of the additional 
 work 
 performed by Subcontractor  
is 
 $17,050.00.  
 
 
14